Water Codes
Water Billing System
Reclaimed Water
Construction Water
Tuscon/ Pima
100

The Code for Water Volume

What is WA?

100

The system that can bill all service types for water billing.

What is the NaviLine System?

100

Highly treated wastewater that is excellent for irrigation but not meant to drink.

What is Reclaimed Water?

100

CW service code

What is the construction code ?

100

The system that Tucson Water and Pima County Regional Wastewater Reclamation Department uses for all accounts

What is the NaviLine billing system ?

200

The code IR stands for what water code

What is Irrigation Volume?

200

This cannot be billed on the same account.

What are two services with the same service codes?

200

The agreement that must be on file for reclaimed water.

What is a Reclaimed Water User Agreement?

200

Location of where a construction contractor can place a meter

What is the fire hydrant?
200

The number of Pima Counties Wastewater Treatment Plants

What is Eleven?

300

BF stands for this water code

What is backflow permit?

300

Name the metered service that is used for the purpose irrigating landscape

What is IR or Irrigation Volume?

300
The color-code for reclaimed water.

What is purple?

300

A metered service provided to contractors for construction projects

What is construction water?

300

The code SW

What is Sewer Volume?

400

Service type code FH

What is fire hydrant?

400

This volume will not be for sewer charges

What is IR or Irrigation Volume?

400

The reclaimed water code

What is RC?

400

Billing occurance for construction water billed

What is monthly?

400

The number of miles in the conveyance system for Pima county sanitary sewers

What is 3,165?

500

Name the two service codes for Reclaimed Water and Reclaimed Water: Davis-Monthan Agreement

What is RC and RW?

500

The types of premises that are metered if connected to the Tuscon system

What is residential, multifamily, commercial, or industrial accounts?

500

The Agreement code RW

What is the Davis-Monthan (DM) agreement?

500

Two Items needed for a construction account

What is a permit and annual test?

500

The amount of water Pima County conveyance system collects per day.

What is 65 Million Gallons?