A daily is required.
What is before first flight of the day?
When approaching the UH-72, Soldiers do not approach from this side of the aircraft.
What is the back or tailrotor side?
The color of the tailrotor pitch links.
What is blue?
I always have this with me when I'm working on the aircraft.
What is the task and FOD bucket?
The ATA code for Main Rotor.
What is 62?
During a fuel sample, water will sit here in the mason jar.
What is the bottom?
This unit of measurement is used to to check for continuity.
What is ohm?
The UH-72B has this many tailrotor blades.
What is 10?
The corrective action of a fault will always include this.
What is the reference?
ATA Code 29.
What is Hydraulic Power?
A pilot complains about air in the hydraulic system.
When ordering parts through ACN, code A is used for this aircraft condition.
What is AOG?
Must be the last one of the season.
What is a dandelion?
AMM XX-XX-XX, 4-1 is this type of task.
What is removal and installation?
What is ATA Code 65?
What is Tail Rotor Drive?
This is the axis direction you push to turn on the IR searchlight.
What is Z-axis?
Never Give Up, ___________.
What is Never Surrender?
The UH-72B tailrotor is controlled by this hydraulic system.
What is one and two?
Plants crave this.
What is Brando or electrolytes?
ATA Code 24.
What is Electrical Power?
Oil is found under #2 drain port, it is most likely coming from here.
What is #2 engine?
The starting wage of a WG-12 mechanic working at AASF #2.
What is $32.81?
The UH-72A has this many tailrotor shafts.
What is 4?
When signing off a task, this FAA certificate is always required.
What is an A&P license?
ATA Code 79.
What is Oil?