hand to surface
what is control of package until placed on next surface
18-24 inches in depth and 12-24 inches in height package that is loaded tightly against the previous wall on the left side of the trailer
What is a cornerstone package?
_____ __ Grip Method
What is Thumbs Up
where is your power zone?
what is mid-thigh to armpits
Test the object for _____ and ______ _______
What is weight and shifting content
unload sequence
what is top left, top right, bottom right, bottom left
obtain ____ _____ as dictated by conditions
HINT: outside of power zone
what is load stand
Push Don't ____
What is Pull
egress
what is a clear path to, through, and away
Signs of dehydration
What is dry sticky mouth, dark colored urine, muscle cramps, and dizziness/light headedness
face the work while standing at a __ degree angle to conveyor
what is 45
long, not fragile-load _________ at the side walls to prevent them from _______
Always Be _____ Of Your ____________
What is Aware and Surroundings
safety meeting day
5 keys to preventing slips and falls
HINT: LEADD
adjust to changing conditions, do not walk on unsecured belts, do not run
Do not grasp packages by ______ or _______
Straps or Bands
Slide, walk or roll
What is heavy irregular shaped objects
Step, Pivot, Don't _____
What is Twist
the most common injury on the day sort
what are struck by injuries
jam breaker aid
what is shepherd hook
NEVER ____ ______ package walls
what is pull down
What do you do if a package is leaking, smoking, or generating fumes
What is do not touch, leave the area, and notify a supervisor
Don't _____ Falling Packages
What is Catch
the most severe injury on the day sort
what is lifting and lowering
previous day front door activity
what is ______________