IAW WITH CO STANDING ORDER NO. 5, WHAT VOLTAGE DO YOU NEED COS PERMISSION TO WORK ON EQUIPMENT OR ENERGIZED CIRCUITS?
30 +
QUICK DISCONNECT FITTINGS (QDF) SHALL BE LOCATED WITHIN HOW MANY FEET OF DESIGNATED VERTICAL/HORIZONTAL FIRE ZONE BOUNDARIES?
10 FT
WHICH PUBLICATION GOVERNS DAMAGE CONTROL AND ENGINEERING CASUALTY CONTROL?
NSTM 079 VOL 3
UPON CHECKING INTO THE USS CHIEF ENGINEERING DEPARTMENT, WHAT ARE THE REQUIRED READING MATERIALS TO BE COMPLETED WITHIN 2 MONTHS?
EUG
TUMS
EDORM
HOW OFTEN ARE ENGINEERING ASA REVIEWS CONDUCTED? AND WHO IS RESPONSIBLE FOR THE OVERSIGHT OF THESE REVIEWS?
QUARTERLY
CHIEF ENGINEER
IAW CO STANDING ORDER NO. 10, WHAT AT A MINIMUM DOES THE CO WANT TO BE ONLINE DURING RMD?
1 ENGINE PER SHAFT
1 GENERATOR PER SWITCHBOARD
HOW LONG MUST A TANK OR VOID BE VENTILATED PRIOR TO PERSONNEL ENTRY?
24 HOURS
WHAT ARE THE SIX CHAPTERS OF THE EOSS USERS GUIDE? (EUG)
ENGINEERING OPERATIONAL PROCEDURES (EOP)
ENGINEERING OPERATIONAL CASUALTY CONTROL (EOCC)
COMMUNICATIONS
LEARNING TO USE EOSS
EOSS FEEDBACK SYSTEM
WHAT ARE THE 5 CHENG PERMISSION ITEMS IAW CHENG STANDING ORDER NO. 2?
TAGGING OUT STEERING OR ANY SYSTEM AFFECTING STEERING AFTER COMPLETION IAW MLOC.
TAGGING OUT MAJOR SYSTEMS WITHIN 24 HOURS OF UW (MPDE,SSDG, MPAC, MRG, CPP, AC, REEFER, MMGTG, FIREPUMP, MAIN SECONDARY DRAINAGE, RO, POTABLE WATER PUMPS, ASW PUMPS, L/O POLISHER, F/O PURIFIER, INSTALLED FF, DECK EQUIPMENT)
OPERATE ANY EQUIPMENT WITH OOC INSTRUMENTS
GIVING ANY TOOLS, PARTS, MATERIALS OR TEST EQUIPMENT TO OTHER SHIPS
USING DC EQUIPMENT FOR ANYTHING OTHER THAN DC
IAW CHENGS STANDING ORDER NO. 6, WHILE OPERATING AT TRI POWER, WHAT IS THE MAX SPEED AVAILABLE FOR A SINGLE ENGINE SHAFT?
AHEAD 6
WHILE COMBATTING A FIRE/FLOODING/TOXIC GAS/HAZMAT SPILL DURING RMD, CO'S PERMISSION IS REQUIRED TO ELECTRICALLY/MECHANICALLY ISOLATE WHAT?
ANY EQUIPMENT OR SYSTEMS AFFECTING PROPULSION, STEERING, OR NAVIGATION.
WHAT ARE THE TWO CRITERIA THAT HAVE TO BE MET FOR WORK TO BE CONSIDERED "HOT WORK" AND WHOS PERMISSION DO YOU NEED TO START COMMENCING HOT WORK DURING AN INDUSTRIAL ENVIRONMENT?
MUST PRODUCE A SPARK
EXCEED 400 DEGREES F
NEED PERMISSION FROM THE FSC
HOW OFTEN IS THE EOSS PROGRAM UPDATED?
EVERY 6 MONTHS
IAW CHENGS STANDING ORDER NO. 3 WHAT STANDARD ABBREVIATION IS SCFM?
STANDARD CUBIC FEET PER MINUTE
IAW CHENG'S STANDING ORDER NO. 7, WHO MAKES UP THE CASUALTY RESPONSE TEAM?
SOUNDING AND SECURITY
WHAT ARE THE ONLY EXCEPTIONS FOR SETTING MAX PLANT RELIABILITY?
WHEN THE SHIP IS WITHIN A MINEFIELD
DURING MAIN SPACE FIRE/MAJOR FUEL OIL LEAK
WHAT 3 THINGS NEED TO BE PRESENT FOR A SPACE TO BE DEEMED IDLH? WHO'S PERMISSION DO WE NEED TO ENTER A IDLH SPACE?
FLAMMABLE VAPORS @ 10% OR HIGHER OF LOWER EXPLOSIVE LIMIT (LEL)
OXYGEN CONTENT LESS THAN 19.5% BY VOLUME OF GREATER THAN 22% BY VOLUME
PRESENCE OF TOXICANTS ABOVE NIOSH PRESCRIBED IDLH LIMITS
NEED CO'S PERMISSION
WHAT ARE THE 6 SECTIONS OF THE TAG OUT PROGRAM?
INSTRUCTIONS
ACTIVE LINE ITEM RECOR SHEETS
ACTIVE TAGS TO BE HUNG
CLEARED
INSTRUMENT LOG
RECORD OF AUDITS
IAW CHENGS STANDING ORDER NO. 6 WHAT ARE THE 4 SPECIAL PLANT CONFIGURATIONS?
TRAIL SHAFT
OPERATING WITH BRAKED/LOCKED SHAFT
TRI POWER (2&1 ENGINE COMBINATION)
MMGTG OPERATIONS
WHILE OPERATING ON SHIPS POWER, DURING A LOSS OF POWER EOOW/EDO WILL RESTORE SYSTEMS IN WHAT ORDER?
FIREMAIN
ASW
CHILL WATER
400 HZ
MPAC
REEFER
OTHER SYSTEMS AND EQUIPMENT DEEMED NECESSARY BY THE CO OR CHENG
IAW CO STANDING ORDER NO. 11 THE EOOW SHALL ENSURE THAT THE FOLLOWING EQUIPMENT IS PLACED IN OPERATION.
4 MPDES ONLINE/CLUTCHED IN
2 SSDGS ONLINE AND PARALLELED (3RD SSDG RUNNING OFFLINE)
1 ASW
2 MPACS
PORT/STBD MRG STBY PUMPS
PORT/STBD CPP PUMPS
MMGTG
1 AC
1 REEFER
2 FIRE PUMPS
ANCHOR WINDLASS AVAILABLE
HPUS AVAILABLE
BOW THRUSTER
F/O SERVICE SYSTEM
FIRE SAFETY OFFICER (CHAIRMAN)
SHIP SUP
RMC REPRESENTATIVE
COMMISSIONED OFFICER AS DESIGNATED BY CO (DCO/DCA)
ENGINEERING PLANNING DEPARTMENT REPRESENTATIVE
PROJECT SUPPORT ENGINEER (ONLY IF NO ONE FROM ENGINEERING PLANNING DEPT IS AVAILABLE)
OTHER COGNIZANT PERSONNEL
IAW NSTM 262 WHAT TEST MUST BE CONDUCTED BY THE OIL KING UPON RECIEPT AND PRIOR TO STRIKING DOWN 9250 OR 15W-40 OIL TO THE STORAGE TANKS.
VISCOSITY
NAME ALL 16 OF CHENGS STANDING ORDERS IN ORDER
1.) GOOD PRACTICES/GENERAL GUIDANCE TO THE WATCH.
2.) REQUIRED PERMISSION/NOTIFICATION ITEMS
3.) STANDARD ABBREVIATIONS
4.) ENGINEERING LOGS AND RECORDS
5.) PHYSICAL SECURITY AND REQUIRED LOCKS
6.) SPECIAL PLANT CONFIGURATIONS
7.) CRT COMPOSITION AND PROCEDURES
8.) RESTORE FROM LOSS OF POWER
9.) MODIFICATIONS TO EOSS
10.) EOOW/EDO RELATION TO CDO/OOD(U/W)
11.) GROUND CHECK/GROUND ISOLATION POLICY
12.) RECALL PROCEDURES AND SHORT NOTICE LIGHT OFF
13.) USE OF BATTLE OVERRIDE
14.) CARE OF NEW L/O
15.) FSW REQUIREMENTS
16.) REQUIRED READINGS ON WATCH
WHO CERTIFIES THE OIL POLLUTION ABATEMENT EQUIPMENT ONBOARD AND HOW OFTEN IS IT REQUIRED?
ARE EXTENSIONS PERMITTED? IF SO FOR WHAT TIME FRAME AND HOW MANY CONSECUTIVE EXTENSION ARE ALLOWED?
COMMANDER NAVAL SEA SYSTEMS COMMAND
5 YEARS
6 MONTH EXTENSION PERMITTED NOT TO EXCEED 2 CONSECUTIVE EXTENSTIONS (12 MONTHS)