UPS
HVAC
SWITCHBOARDS
FIRE SYSTEMS
MV GEAR
FINAL JEOPARDY
200

These are the functions of a UPS

What is to condition power and provide battery backup

200

What is the Tonnage of the Chillers at VA11

What is Trane PH1: 275
Trane PH2: 300
Multistack: 313

200

These are the sources of control power at VA11

What are HUPS HL1, HUPS HL2, Battery

200

This is the type of sprinkler system used in Office/ Common Spaces

What is Wet System

200

This mechanical safety device ensures you do not close into a fault

What is 86 Relay

400

These are the four main components of a UPS

What is Rectifier, Inverter, Battery, STS

400
These are the types of compressors used in refrigeration


What is Reciprocating, Screw, Scroll, Centrifugal


400

This is the Amperage Rating of the Maintenance Bypass Breaker, UPS Inputs and UPS Outputs for VA11

What is 2500A, 1600A, 1600A


400

BFPE is performing work on the sprinkler system.  This is required to start work.

1. Call the system out in Test with BFPE
2. Call LCFD to tell them system is in test.
3. Complete Zurich Impairment Form

400

These are the feeder sizes (A) for VA11, VA12 and VA13

What is 600A, 900A, 900A

600

This is the function of a Static Switch

What is to provide power in a fault condition

600

This is our designed glycol percentage and color

What is 25% and Green

600

These are the positions for rackable breakers

1. Connected
2. Test
3.Disconnected
4. Withdrawn

600

This is how VA13 maintains fire system pressure and flow on the third floor

What is a Fire Pump

600

This is the arc quenching gas that is used inside our MV Gear and the operating pressure range

What is Sulfur-Hexafluoride (SF6)
5PSIG-15PSIG (sits about 9PSIG)

800

These are the ratings of the UPS
(KW, V, A, HZ, PF)

What is 1MW, 480V, 1200A, 60HZ, .99pf

800

This is why we care about Superheat.

What is to ensure no liquid refrigerant enters the compressor.

800

These are the requirements to open UPS Output breaker without dropping customer load

What is:
1. Place UPS in Static Bypass
2. Verify on SWBD
3. Close MBB
4. Verify Load shared
5. Open Output Breaker

800

This is the required pressure to hold the check valve closed on a preaction system

What is 13 PSIG

800

VA11 MV3 can be fed from these locations

What is
1. VA12-MV3-Way 1
2. VA12-MV4-Way 1

1000

If we have two 1MW UPS in parallel carrying 1800KW and UPS 1 loses a module this will be the loading of both UPS and this is what happens to the system.

What is UPS1 is 720KW; UPS2 is 1080KW
UPS 2 will be in Overload condition for 10 minutes.

After the OL does not clear, UPS will transfer to Static bypass and the load will be: UPS1 900KW, UPS 900KW
1000

Daily Double: This is the Refrigeration in our chillers and its  Ozone Depletion Potential 

What is R134 and zero

1000

This Switchboard at VA11 has a temporary chiller feeder breaker

What is DM3&4-CX-E Lineup.

1000

Daily Double: This is the temperature rating that a Yellow bulb will burst.

What is 174F

1000

VA12 is currently on Gen and verified off utility
This is the process for LOTOing way one to ground.

What is:
1. Open all motor operated Ways
2. Obtain Clearance Paperwork from Dominion
3. Take Way 1 to Open
4. Take Way 1 to Ground and LOTO

1000

This is a dip in the discharge voltage observable during the first minutes of the discharge period of a lead acid battery, followed by a transient recovery

What is Coup de fouet (crack the whip)