Escalation
Move Night
Execution
Post Open
Wild Card
100

Who / when do you flag if you are missing fixtures, hardware, or mannequins?

Who is Project Manager + Josette

100

It's your first day in market, what are the first things you need to audit?

What is mannequins, fixtures, and hardware to ensure nothing is missing or damaged

100

When do you schedule your final walkthrough with Josette + your Mentor?

What is the last day of turnover before 3pm local time? 


100

What are the deliverables for opening photos? 

What is 24 hours, upload to Sharepoint and send full album to Josette?

100

What is the best coaching to offer when the store team asks where to place markdowns?

What is closest to the back of store, preferably on one side of a midrack?

200

What day is signage supposed to arrive and who do you flag when its missing?

What is Friday and who is Josette

200

What should be set and ready to go before move night?

What is OSL?

200

Its the end of day on Monday, what tasks should have been completed? 

What is destinations and accessories?

200

The store has officially opened--yay! What should you do before leaving the store?

What is walkthrough with VMS + SM?

200

Situation Station: Store team wants to change the layout two weeks post open. What would your coaching be?

What is coach store team to live into their layout at least 90 days post open and partner with Josette?

300

You are auditing the TOK and cannot find the correct pins for the pant wall, who should you flag?

Who is Project Manager and Josette?

300

What guide do you use to set the hardware measurements?

What is the VM Execution Guide?

300

I am the most time consuming VM task in turnover. Teams need to be trained on me who am I?

What is pant walls?

300

When do all of your expenses need to be submitted by?

What is two weeks post open?

300

What tool "office supply" should the VMSOS use to support in communicating daily tasks to the store team?

What is sticky note?

400

Who do you flag when product levels are impacted?

Who is Product Partner + Josette

400

When do you schedule your first walkthrough with Josette and your Mentor?

What is the first day you are in market?

400

What resource can you leverage to help inspire styling tactics?

What is the Global Styling Guide?

400

What does the cadence look like for post-open support with the VMS?

What is 30-60-90 day check in?

400

Situation Station: You and the SMSOS assess lack of proficiency in product presentation standards, but high team engagement and sense of urgency. How would you prioritize store team's labor to ensure the store openings successfully and executed well?

What is:

-Grid out all tables for someone to fold down?

-Pull mannequin looks for store team to steam and dress?

-Delegate destinations with specific monthly directives?

-Layer in additional VMSOS support post open to close gaps in store team VM skillset?


500

You notice that the shelving for the footwear fixture is not installed properly, who and where do you flag this?

What is escalation channel?

Who is Project Manager?

500

Move night is completed! Name three measures of success?

What is:

-all product is moved over

-accessories are sorted

- product is placed in its general home

- all product is removed from boxes

-pants are sorted into the pant walls

500

Its the eleventh hour and you only have limited time left to perfect your execution, what areas of the store are your top priorities? 

What is front of store? 

500

After photos have been uploaded, what is the last task to complete post-open?

What is schedule 45 mins post open review with Josette + fill out self-assessment?

500

Situation Station: Its 5PM the night before open, refill is over 1,000 half are which are pants. All stories are set and pant walls are gold standard, what would you do?

What is partner with SMSOS + store leaders to refill the floor after store photos?