The two areas that we tend to see paint failures first.
What are horizontal surfaces and trim?
The base small job fee applied to small jobs as a starting point.
What is $270?
The timeframe in which estimates should be sent to homeowners.
What is within 24 hours?
The length Hardie board plank siding is commonly sold in.
What is 12 ft?
The length in years of Vivax's warranty options in Colorado.
The product applied to brick before painting when it has not been painted previously.
What is block filler primer?
The brand and product we recommend for new, unstained wood decks/pergolas/fences.
What is Guiry's oil-based transparent stain?
This must be completed when a homeowner wants to change the accent color as a small job.
What is the Color Release Form?
The number of outlets required for a gutter bid with 6 downspouts.
What is 6 outlets?
Vivax's core values.
What are Enthusiasm, Pride, Perfection, Ownership, and Integrity?
The process by which water soluble components of the paint separate and rise to the surface, appearing as streaked, discolored areas.
What is surfactant leaching?
The cost per linear foot of railing to apply Deck & Dock to a railing in bad shape.
What is $12 per linear foot?
The 3 things we must discuss with the homeowner at the end of an initial walkthrough.
What are...
1. Confirm if they have paint
2. Confirm contact info
3. Mention reviews when the project is complete
These boards must also be replaced in most cases when replacing cottage lap siding and panel siding.
What are trim boards?
The distance from which 3M plastic must extend when working on a lead positive home.
What is at least 10 ft?
The component in Duration paint that gives it a higher color retention.
What is a higher level of titanium?
The price to the homeowner for us to prime and paint 5 new sets of shutters.
What is $1,120?
The percentages of net profits you get credit for based on the days since collection
What are...
0-7 days since collection: 100%
8-14 days: 75%
15-21 days: 50%
22+ days: 0%
The process for installing a fascia board under a stone tile/stone coated steel tile roof. 
What is the roofer must uninstall/reinstall the roof tiles?
These are the department heads for Denver.
What are...
Coleman Harris - Head of Production
Kayla Farber - Head of Sales
Jamie Nershi - Director of Warranty
Scott Bondy - Director of Marketing
Chelsea Teston - Director of Coordination
After posting the lead certificate, notifying neighbors, and placing caution tape and plastic, these are the prep steps for warranty work on a lead positive home.
What are...
1. Provide crew with suits/masks/gloves
2. Scrape one side of home
3. Wipe down with rags
4. Caulk and prime
5. Clean up with HEPA vac and goose neck trash bags
The amount this homeowner received for painting the front side following hail damage.

What is $1,160.36?
The 9th component of the Warranty Manager SMaC recipe.
What is... "I take pride in completing my administrative duties to support clean processes within the department. Friday is my opportunity to make sure my crews are paid, jobs are closed, make sure paid jobs are collected, and send updates on any open jobs to my manager"?
The number of linear feet of siding needed to replace all laps on the gable from the red line up (7 laps), the bottom lap measuring 30'.

What is 138' linear ft of siding?
The number of gallons of product Vivax purchased from Sherwin Williams in 2025.
What is ~114,000 gallons?