Safety/
Competency Matrix
Tagging
CIL/Centerlines
TPM methodology
Other
100
Each month every employee is required to complete these two safety tools.
What are friends helping friends and risk predictions?
100
An abnormality you can fix yourself and use this to document, track and resolve the issue.
What is a blue tag?
100
This is indicated by a red dot on a CIL or CL completion chart.
What is the CIL or CL task was not completed?
100
TPM is set of tools and methodology that nestle has chosen to continue to drive for Nestle Continuous Excellence. TPM is an acronym for what?
What is Total Performance Management?
100
The TPM tool that creates a visual for all of the losses on a given machine.
What is the Visual Loss Map?
200
This visual tool is utilized to identify hazards on the line and communicate them to new or unfamiliar employees
What is a SHE map?
200
The person I need to call and negotiate EVERY red tag.
What is a Maintenance technician / MWG?
200
Target for step 2 CIL adherence
What is 90%?
200
Percent of SOC’s to be eliminated in Step 2
What is 80%?
200
The last S in 5S.
What is Sustain?
300
This model is utilized to create IDP actions.
What is 70-20-10?
300
Number of open tags divided by number of total tags
What is the gap of tags?
300
On a CIL chart, this in indicted by a blue dot.
What is a CIL or CL task completed but with issues (taking longer or an abnormality found)?
300
TPM step that introduces Lubrication tasks to the AWGs
What is Step 3?
300
Percentage of index of minor stops must be reduced by to pass TPM step 2
What is 50%?
400
The mode of intervention that requires LOTO.
What is Mode 3?
400
The next step in the tagging standard routine after a tag is written and negotiated.
What is give the tag to the tagging system owner to enter the tag into the SAP tagging system?
400
Number of total CIL tasks completed divided by the number of total CIL tasks.
What is CIL adherence?
400
Pillar that owns problem solving tools and methodology to help understand losses and launch projects to improve results.
What is the FI pillar?
400
Tool used to facilitate knowledge transfer.
What is an OPL?
500
This is the target percentage for Competency matrix and my personal IDP?
What is 90%?
500
The number of blue tags divided by the number of total tags
What is AWG autonomy?
500
These three tasks are done when a centerline is out of compliance.
What is marking task with blue dot, contacting MWG, and informing oncoming shift why the centerline is out of compliance?
500
The 3 deliverables of TPM
What are achieve Breakthrough results, Transform the workplace, and Increase knowledge and engagement?
500
SOC / HTRP elimination will directly impact this.
What is CI time?