WWW / FFF
HSSE
FCF
Wild Card / E&C
Asset Integrity
100

What is the FLBM completion target for 2018? 

a.100% b.90% c.85% d.95%

A. 100%

100

When was Oloma Remembrance Day

a) Nov 12

b) Nov 20

c) Nov 22


c) Nov 22

100

SPDC's 2018 Fit for the Future ambition is described in 3 numbers. What are the numbers?

“1-0-1”

100

Shell is the operator of a Joint Venture agreement involving NNPC, Total, Agip and Chevron. True OR False.


False

100

What is the full meaning of the abbreviation - AIPSM?   a. Asset Integrity & Process Safety Management b. Asset Integrity & Process Standard Management 


a. Asset Integrity Process Safety Management 


200

The OER has ________ Game Changer Themes

a) 7,  

b) 5

c) 6

d) 3 

A) 7

200

Mention the 3 HSE golden rules. 


Compliance, Intervention, Respect our neighbours

200

Which of the following is NOT a LEAN tool?  

a. 5s  

b. Kanban  

c. Kimshi  

d. Kaizen


c. Kimshi


200

E&C - If I'm invited to speak at a conference on a topic related to my work at Shell. There is no E&C issue if I request for travel allowance, payment or gifts from the organisers.

TRUE / FALSE


FALSE

In general, external speaking opportunities should be work-related and bring mutual benefits to Shell as well as the organiser. Speaking opportunities should therefore be considered as part of your role and Shell should take up all costs, including travel and accommodation.


200

Process safety starts when? 

a. At early design phase of building facilities  

b. During commissioning and hand over 

c. During operations  

d. At end of life of the facility

 

 a. At early design phase of building facilities 

300

Mention 3 of the 7 Winning Ways of Working.

Safety/Goal Zero,  Compliance,   

Integrated Delivery,  Continuous Improvement,    

Commercial Acumen, External Alignment, 

Cost Ownership

300

Mention 5 of the 12 Life saving rules.


Valid work permit;   Conduct gas tests;  Verify Isolation;   Confined space; over-riding SCE; Working at height; Suspended load;   Smoking areas;    No alcohol/drugs while working/driving;   Do not use phones while driving;  Use Seat belts; Journey mgt.

300

What is the Group Business Performance factor (BPF) as at Q3 2018? 

a. 1.05 b. 1.24 c. 1.04 d. 1.14


c. 1.04


300

E&C - Do I need Line Manager approval to refuse G&H offered to me? 

YES / NO 

NO

300

Mention 4 of the Process Safety Fundamentals. 


Double barriers for hydrocarbon vents & drains; Don't leave Open drains or critical transfer unattended; Take interim mitigation in case of failure of SCE; Follow procedures and sign-off each step for all critical activities; Walk the line; Don't make change without Proper MOC,  Verify for tightness; Always check that equipment is pressure free and drained before mtce work; Perform MOC & install back flow protection; Respond to Critical Alarms;   


400

The ______ makes all Improvement projects in SCiN visible across the whole organization

a) SharePoint

b) BI Portal

c) Wave 

c) Wave 

400

What is the new general emergency number?

a) 180 , 

b) 199  

c) 222

d) 991 

b) 199

400

What is the full meaning of the abbreviation - IPSC? a. Integrated Production System Centre 

b. Initial Production System Capacity 

c. Integrated Production System Capacity 

d. Internet Problem Solving Contest


c. Integrated Production System Capacity


400

E&C -  ______ condition should necessitate inclusion of ABC Clauses except:

A] New contract;  B] Renegotiation of a contract not containing ABC clauses; C] 3 years has elapsed since the signing of original contract not containing ABC clauses; D] White flags have been discovered on the counter party. 

D] White flags have been discovered on the counter party. 

There is nothing like White Flags, the correct answer is Red Flags


400

Which of the following is not a KPI for Asset integrity?  

a. Design Integrity       b. Technical Integrity   

c. Financial Integrity    d. Operating Integrity


c. Financial Integrity


500

Mention 3 of 7 Game Changer Themes of OER

1. Wider Implementation of SBOs 2. Fast-Track High Impact Technologies 3. More Effective In/Outsourcing 4. Eliminate Value Eroding Practices 5. Reduce & High-Grade Infrastructure Footprint 6. More Efficient External Interfaces 7. Simplified Structure & Inspired People

500

Mention 3 of SCiN 7 Security Rules

1] Do not breach Access Control Procedures; 2] Wear a Valid SCiN Badge; 3] Comply with Visitor Procedures; 4] Comply with an Approved Security Plan ; 5] Comply with Clear Desk Policy/Safeguard Equipment; 6] Stay Alert ; 7] Observe & Report Security Incidents/Suspicious Activity

500

Mention 3 of the SCiN cost saving rules.

1] Start with Minimum Functional Specification; 2]Challenge Project specifications, Scope & Price. Establish “Should Cost” 3] Define projects and activities with ‘Cost’ as Key Value Driver; 4] Apply Lean Assurance, fit for project size or complexity; 5] Own your Activities, Projects and Contracts; 6]Work within Approved Budget; 7] Secure Approval before Commitment; 8]Think Cost in Naira; 9]Demobilize Idle Resources; 10] Use In-house Resources and Experience as Default; 11] Avoid Non-Value Add Exposure; 12] Always optimize and share resources

500

E&C - Existing contracts should be re-screened when they are renegotiated. 

TRUE or FALSE

TRUE

500

A SoF is required in all but one of the following scenarios:  a] Starting or commissioning a new asset  b] Restarting an asset after a modification  c] Restarting an asset which has been out of service  d] Changing a bean box


d. Changing a bean box