WPS
Operations
Wal-Mart History
Get To Know Your Team
Do You Remember?
100

This is what DMS stands for:

What is "Daily Management System?"

100

The Non-Divert (ND) is defined as 

What is "Case went under incode Scanner, system scans label but case never diverts to correct trailer"

100

Sam Walton operated "X" prior to starting Wal-Mart. 

Who is " Ben Franklin convenience store branch "

100

Mike Herrera's favorite baseball team is "X"

What is "Los Angeles Angels"

100

What was the Safety go due from the last call? 

What is "check if your DC has an "at a Glance" associate walkway through the DC. If not, work with the team on closing the gap

200

The 7 steps of the FI Program are

Step 1: Training

Step 2: Oversight, Creation and Generation 

Step 3: Project Selection and Priritization Training 

Step 4: Project Team Selection Training

Step 5: Execution of Methodology

Step 6: Link to DMS/Project Health Check

Step 7: Replication and Sharing 

200

Breakpack Department is part of the "X" Function

What is "Ordefilling"

200

The first Sam's Club opened in (Year)

What is "1983"

200

One of Leo's favorite winter activities is "X"

What is skiing 

200

By what date is the Scorecard and Gap Closing plan due? 

What is 5/7

300

RO has "x" steps

What is "5 steps"

300

Workstation Processor's Cycle steps are 

What is 

  • Scan dock tag
  • Scan, label and place cases onto the mainline
  • Place cases onto the mainline for the ACL
  • Complete the dock tag
  • Remove empty pallet from workstation and place in staging area

Want more information?

Click the image above or click here!

 

TPR Code: 001006002

ACL TPR Code: 001174523

300

"X" came up with the name Wal-Mart

What is "Bob Bogle". Bob was Sam's assistent and who was responsible for purchase and maintenance of signage 

300

Mark Sims used to work in DC "X" as an "X"

What is DC "6025" as a "Merge Operator"

300

How does our team define winning in FY'22 (Hint: 2 callouts)

What is 

1.WPS all programs fully integrated as a Standardized Operating System

2.Phase Progression Timelines achieved delivering Culture, Process, and Results


400

The 7 Steps of a fully integrated WPS program as a Standardized Operating System (hint: starts with OBW) are...

What is OBW, Standard Work, CSD, Process Mindset (Audits), DMS, Understanding Loss, DMAIC

400

DA ACL Processor Cycle steps are:

What is:

ACL Processor

  • Identify freight types
  • Remove pallets from inbound trailers
  • Load conveyable freight onto the ACL for processing
  • Open and close the extendable into the trailer

Want more information?

Click the image above or click here!

 

TPR Code: 001174002

400

in 1988, "X" succeded Sam Walton as the CEO

Who is "David Glass"


400

Jason Brooks has held "X" positions in Walmart

What is "10"?

•Maintenance Operations Manager

•Interim SCIL

•Maintenance Area Manager

•Asset Protection Associate

•DA & Staple Stock Unloader

•FID Processor

•Shipping Loader

•Yard Driver

•Produce Department Manager

* SCIL 

500

5 steps of the RO system are:

Readiness, Foundation, Improvement, Stabilization, Prediction

500

Per CSD, DA Rec has "X" specific roles

What is "10 roles"

ACL Processor

X-Dock Associate

Ergo Depal Processor 

Exc. Clerk

Ext. Unloader

Hauler

Mixed SSTK Non-Con Processor

Unloader

UPS

Workstation Processor 

500

Walmart's E-Com headquaters is located in "X" (City)

What is "San Bruno, CA"

500

Rishona's favorite College Football team is "X"

What is "The Ohio State Buckeyes"