Alphabet Soup
Right Place, Right Practice
Flow With It
Field Facts
Check It Before You Wreck It
100

LMRA

What is Last Minute Risk Assessment 

100

Something you would complete before beginning any LAI or LSRA work to identify potential hazards and controls

What is Pre-Task Briefing

100

If work is LAI or LSRA, this is your next step according to the flow chart.

What is Pre-Task Briefing

100

This is how a Last Minute Risk Assessment (LMRA) should be conducted when working in the field.

What is Individually

100

This is the number of Start Work Checks used to ensure tasks begin safely at Imperial Oil.

What is 12
200

PSMS

What is Personal Safety Management System

200

Complete this individually before starting a task or when conditions change to ensure the work can be done safely.

What is Last Minute Risk Assessment 
200

After successfully completing an LMRA, this could cause you to stop the task before starting work. 

(2 Correct Responses Required)

What is Trigger Point 

What is Hold Point 

What is Error Prone Situation

200

This is what you should do if you see someone doing something unsafe.

What is Intervene & Stop the Job

200

 The most commonly used Start Work Checks on site.

(2 Correct Responses Required) 

What is Working Around Mobile Equipment 

What is Working at Heights 

What is Line of Fire 

What is Driving

300

SWC

What is Start Work Checks

300

Reference documents used prior to beginning any LSRA or LAI work.

What is Start Work Checks

300

This is the tool you must use for both LAI and non-LAI work.

What is a Last Minute Risk Assessment

300

These are created every month by the workers to highlight key safety themes and promote awareness.

What is Focus Areas, Target Points, or Red Pen Focus

300

Start Work check: I confirm the atmosphere has been tested and is monitored

What is Confined Space

400

LSRA

LAI 

(2 Correct Responses Required)

What is Life Saving Rules and Actions 

What is Life Altering Injuries 

400

You could easily find a condense version of the Start Work Checks here

JSA

400

This is the name of the chart that guides you through determining the correct process for different types of work, including LAI and non-LAI.

What is Safety In The Moment

400

These two terms are used to confirm that safety measures are both present and functioning as intended.

What is Verify and Validate (VnV) 

400

Start Work Check: Safety devices such as alarms, lights, seat belts, brakes, and audible alarms(s) are functioning

What is Working Around Mobile Equipment 

500

FLS

SLS

TLS 

(3 Correct Responses Required)

What is First Line Supervisor 

What is Second Line Supervisor 

What is Third Line Supervisor

500

It is facilitated by the supervisor/team lead with the people doing the work to better understand how work gets done and what we can learn from successful work.  

What is After Action Review

500

While "safety in the moment" is developed at the employee level, this aspect of PSMS is developed at the supervisor level.

What is Safety Capacity

500

Used to observe how work actually gets done compared to the task related standard and/or other documentation.

What is a TLO - Targeted Learning Observations

500

Start Work Check: Workers use 3-points of contact technique, keeping body facing and near the middle of the ladder when ascending / descending ladders 

What is Working at Heights