400
I have an urgent issue. I can be either timely, but partial; or I can be thorough, but late. What would Nikhil expect me to do?
The Third Alternative. Figure out the long term plan. If short term fix is consistent with the long term, execute it as it is. If it is inconsistent, analyze the impact of doing it later. Align expectations and consequences with the leadership.