When to stretch
Before lifting items on route
5 min brake test
What is pump down, pump down, turn off, push and hold, pump down
What is step 2 of HECP
Notify affected employees
Proper container placement
Container placed off of street
Looking at around the truck at all times
See 3-6-9
Not sure of a clearance
G.O.A.L.
Tag, Call, Picture, Report
HOC process
Energy Sources
Gravity, Hydraulic, Electric
Making a complete stop at a stop sign
Stop behind white solid bar/sign for 3 seconds, 3-6-9

Find a safe space
Getting out and walking around after routine breaker is _____ the mind.
Resetting
Down time process in order
Identify, Control, Call shop, Dispatch, OM
How to verify energy isolation
Try to start the truck
Checking in at the completion of the route
1098 - phone dispatch - insert lift count (RYC)
What do we need to do while servicing cans
Think outside the cab
How to make sure intersection is clear before proceeding / clearing left side of truck before pulling off of stop
Look left-right-left
Fuel, Clean behind the blade, PTIL, Park
Arrive to yard
LCR#1
Isolate potential hazardous energy
When the ground is wet
Slow down, give more space to allow for longer stopping distance
Determine what other drivers might do
Evaluate other drivers
Look at the truck before heading to the dump or yard
Making sure the truck is in good condition to travel
Pull, Aim, Squeeze, Sweep
PASS method for Fire Extinguisher
Can anyone do any HECP on any equipment?
No, only employees who have passed the correct DEMO back
Authorized breaks
30-minute lunch, 2–15-minute breaks after working for 1 hour on route

Advance your field of view