Protocol
Work Order
Budget
100

Who is the reponsible for protocol implementation into the Respiratory Software?

Study Implementation Manager

100

This document defines what was sold, what services are included, and the responsibilities of both Clario and the customer.

Work Order

100

This device is used to verify calibration performance of spirometry equipment

Calibration Check Syringe

200

Who do you contact internally to confirm the current version of the protocol?

Business Development 

200

According to the Work Order, this person serves as the primary customer contact throughout the project.

 Project Manager

200

This type of review has both a standard 48-hour turnaround and a 1-hour EXPRESS option

Spirometry OverRead

300

Sporometry guidelines that are being implemented in respiratory software are based on ______

ATS-ERS 2005 & 20019

300

This formal document is required when scope, cost, timelines, or services change after the Work Order is signed.

Change Order

300

These training sessions are included for experienced, intermediate, and novice users.

Virtual Training

400

What does SOA stand for?

Schedule of Activities 

400

This is the number of countries participating in the study AP02-003.

8 countries

400

This is the estimated total Pass-Through Expense amount.

$85,700

500

Is a period of time set to exclude the influence of previously used treatments or drugs on the test result

Washout Criteria

500

This is the target Database Lock date in Protocol 

AP02-003?

January 30, 2027

500

This is the total number of SpiroSphere Spirometry/ECG systems included.

77 devices