WHEN AND WHAT TPMTE CAN BE SUBSTITUTED AND BY WHO?
ANY COMMON HOUSE HOLD TOOLS OR ITEMS CAN BE SUBSTITUTED BY THE WSC AS LONG AS IT MEETS OR EXCEEDS REQUIRMENTS.
4C AT THE BEGINNING OF AN MRC CODE STANDS FOR WHAT
DECEMBER 2024
SOME FORM OF MARK ON A CHECK.
A JOB IS WRITTEN WHEN?
ANYTHING THAT REQUIRES MANHOURS IS DONE.
DEFINE THE DOD STATMENT IN YOUR OWN WORDS
.........
THIS DOCUMENT TELLS YOU HOW TO DISPOSE OF HAZARDOUS MATERIAL.
HMUG. ( FOR BONUS POINTS WHAT DOES HMUG STAND FOR )
0.3 MAN HOURS IS THIS AMOUNT OF TIME
18 MINUTES
YOU SHOULD ONLY SIGN OFF A CHECK WHEN THIS OCCURS
WHEN THE MAINTENANCE IS COMPLETE
THE SECOND POINT OF CONTACT IS ALWAYS?
THE LCPO
THE PERIODICITY OF A CHECK THAT POPS EVERY 4 YEARS IS THIS
48M
WHAT IS A SCAT CODE USED FOR?
THE LARGEST PERIODICITY CODE IS THIS.
A
MAINTENANCE IS COMPLETE WHEN THIS OCCURS
WHEN IT IS SIGNED OFF IN SKED
NOT IN MODEL.
THE TAGOUT AUDIT IS PERFORMED THIS OFTEN
EVERY WEEK
WHAT DOCUMENT IS THE ELECTRIC SAFTEY BIBLE?
NSTM 300
43P1 IS THIS?
THE WORKCENTER BINDER
THIS IS DONE WHEN A CORRECTOIN IS NEEDED TO A MRC OR MIP
FBR ( WHAT TWO TYPES OF FEEDBACK REPORTS ARE THERE? )
THIS IS THE STATUS OF A JOB WHEN A MAINTENANCE PERSON FIRST CREATES IT
OPEN
THE FIRST PERSON THAT SIGNS A DANGER TAG IS
THE AO
WHAT DOES SPIN STAND FOR?
STANDARD PMS IDENTIFICATION NUMBER.
THIS DOCUMENT IS ALSO KNOWN AS THE PMS5
LOEP (WHAT DOES LOEP STAND FOR)
SKED STANDS FOR WHAT.
scheduling aid
A JOB BECOMES THIS STATUS WHEN AN OUTSIDE ENTITY COMPLETES IT
TECH CLOSE
LU AND SU CHECKS ARE APART OF THIS PROCESS
IEM