What are 2 disciplines of planning?

Transportation Planning

Urban Planning

Environmental Planning 

Financial Planning

Strategic Planning

Airport Planning (technically part of transportation planning)

100

When should public involvement begin? 

Hint: After the FAA issues a what?

Notice to Proceed (NTP)

100

Zoomed in version of ALP for densely developed airport areas

Terminal Area Plan

100

What is the first step in an airport master plan study? (from our 10 step planning process)

Pre-planning & Study design

100

What was my job before teaching at FIT? What company did I work for? (Hint: they will also be at the job fair today!)

Airport Planner/consultant at AVCON

200

What are 2 types of NPIAS Airports?

Hint: One usually has enplanements one usually has GA traffic 

Primary Airports

Non-Primary Airports

200

What is a SOQ? What it stands for and purpose

Statement of Qualifications -consultants send in response to airports RFQ: then selected based on qualifications, experience, and credentials instead of fee

200

Presents all critical airport information in tabular form

Data Sheet

200

Name the parties involved in an AMPU study design. 

FAA, Sponsor, and Consultant
200

_____ + _____ = Budget

Scope of Work (SOW) + Schedule

300

These airports provide pilots with attractive alternatives to using congested hub airports

Reliever Airports

300

2 elements of the master plan that require FAA approval

ALP- Airport Layout Plan

Forecast

300

Used to show obstruction data and imaginary surfaces

Airport Airspace Drawing

300

Name 2 requirements of an existing conditions analysis

• Airport Background
• Inventory of Existing Facilities
• Regional Setting and Land Use
• Environmental Overview
• Socioeconomic Data
• Historical Aviation Activity
• Financial Data

300

What are the 3 most common environmental concerns on an airport?

Aircraft Noise

Air Quality

Water Quality

400

What does NPIAS stand for?

National Plan of Integrated Airport Systems

If you don't know this you are in serious trouble for Exam 1 

400

What does NEPA stand for? What year was the act passed?

National Environmental Protection (Policy) Act of 1969

400

Shows the property of the airport using metes and bounds

Airport Property Map or Exhibit "A"

400

The goal of this is to provide framework to guide future airport development, satisfy demand cost-effectively, and consider environmental and socioeconomic impacts

Airport Master Plan

400

What is an avigation easement?

When the airport is unable to purchase the land required, they may use this to secure airspace for airport/runway approach protection and for noise compatibility

500

What is a SASP?

State Aviation System Plan or Statewide Airport System Plan

500

This act created the AIP

What does AIP stand for? 

Airport and Airway Improvement Act of 1982

Airport Improvement Program

500

Shows all existing and proposed facilities on an airport. Can be one or two sheets

Airport Layout Plan

500

List 3 types of internal stakeholders at an airport that we discussed in class 

Airlines

Tenants

Concessionaires

TSA

CBP

500

What is the guiding principle of the planning process? Hint: 4 key words for full credit! 

To develop a safe & efficient airport using acceptable standards & procedures