List one of the four Aspects of Infrastructure
*Power
*Water
*Gas
*Fire Protection
Congrats! You won a gift card!
What are 2 of the 6 requirements a Lab Area must have?
a. Main open lab area with 50% build-out of lab casework.
b. 1 or 2 fume hoods (6' or 8')
c. A few lab sinks
d. Casework can be mobile or fixed
e. Utility / loading room
f. A couple Lab support rooms (12' x 15' approx.)
*Congrats you won a gift card!
What is the typical range for the cost per square foot on General Core and Shell Building Upgrades?
$50-$100 per square foot
Congrats! You won a bottle of wine!
From today's training, how many Types of Conversions are there?
4
Congrats! You won a gift card!
What Type of Lab Requires More Equipment?
Chemistry Lab
Congrats! You won a bottle of Grey Goose!
List 3 of the 10 Key Aspects of Conversion
1. Construction Type
2. Infrastructure
3. Zoning
4. Parking capacity
5. Restroom fixture Count
6. Floor-to-floor Height
7. Elevator
8. Upper floor structural capacity
9. Loading area
10. Fire Rating for Lab Control Areas
Congrats! You won a gift card!
How many air changes per hour are required for the HVAC in a lab setting?
10 changes per hour
Congrats! You won a gift card!
What is the typical range of the cost per square foot for the overall project? (Including General Core & Shell building upgrades, Office Upgrades, and Lab Side improvements)
$200-$300 PER SF for the final cost
Congrats! You won a gift card!
List an Examples of a Type of Conversion
A. Ground Up
B. Conversions with Spec Lab
C. Tenant Specific
D. Conversion Shell Only
Congrats! You won a gift card!
What is an example of a practice occurring in a biology lab that requires specialized equipment?
a. Cell and Tissue Culture
b. Imaging
c. Microscopy