PPE
Working From Heights/Fall Protection
Crane
Fire Safety
Miscellaneous
100

Cut resistant gloves with a Minimum ANSI/ISEA Level ______ are required on the job at all times.

Level 2

100

A- frame step ladders over ___ feet in height shall be of the platform or podium type and must be equipped with cross member that lock rigidly in place.  

4 feet

100

All tower cranes, construction personnel or material hoists and/or other crane set up or assembly on the project will require ____ inspection.

Third party inspection 

100

Where is the muster point for EOB Wynn?

Employee Parking Lot 

100

Anchorages used for attachment of personal fall arrest equipment shall be capable of supporting at least ______ pounds per employee attached.

5,000 Lbs

200

Does a government employee/ Osha representative required to where PPE on job sites?

Yes in required areas 

200

At what size doses a hole need to be protected?

2 in or greater

200

All tower cranes must utilize reliable ____ communications at ground loading zones as well as any designated landing zones. 

Two-Way Communication 

200

At what distance doses each fire extinguisher need to be separated?

75 feet 

200

All Trade Partners are required to complete a ______________ before any work is undertaken.

Pre-Task-Plan (PTP)

300

When drilling overhead, using a chop saw, using masonry/carpenter saw, concrete cutting, grinding, or similar activity what PPE is required?  

Face Shield or Goggles 

300

How many perimeter cables are required for perimeter protection?

4 perimeter cables 

- A cable at 0 above the deck 

- A mid-cable at height of typical middle guard rail 

- A cable as a top rail at 39" to 45" above the deck 

- A cable 60" above the deck 

300

Any crane load meeting or exceeding 75% of the chart (rated) capacity of the crane, involving multiple crane or hand off picks will require _______.

Critical Lift Plan 

300

After completion of hot work how long doses the fire watch need to be present for?

60 min

300

Materials shall be stored for no more than _____ duration to minimize storage area issues, unless previously approved by suffolk project staff.

2 Weeks

400

In windy condition and when working at elevated location, what is required?

Hard hats shall be tethered to the worker to prevent them from falling.

400

When "Christmas treeing" steel beams, no more than ____ pieces shall be allowed in a single lift and only approved multiple lift rigging shall be used.

3 Pieces 

400

All tower, crawler cranes and on site assembled crane set-ups shall be reviewed by __________ and ________ documentation shall be submitted to the company prior to the equipment being set up in the designated area.

Professional engineer and stamped/sealed documentation 

400

What doses FPPM stand for?

Fire Prevention Program Manager 

400

No one worker is required or allowed to lift or carry more than _________ pounds.

80 Lbs

500

What PPE is required at minimum at all times for all employees while on the project site?

Approved hard hat, safety glasses, task specific gloves, work boots, long pants, high visibility vest or shirts and short sleeves are required at minimum at all times on the project site. 

500

Where no other fall protection is provided, workers shall wear a properly fitted and adjusted personal fall arrest harness secured to an approved anchorage point when working within six feet of any leading edge or within ___ feet of any unprotected perimeter edge at an elevation of six feet or more from the next lower level.

15 feet 

500

What pieces of information are required for a trade partner to submit in advance for crane activities? (6 elements of the pick plan)

Crane Inspection Records, lift Plan, Operator License, Hoisting License,  Medical Examination Card, Pre Task Plan 

500

What size fire extinguisher doses someone need when performing hot work?

20lb ABC fire extinguisher 

500

What is the color code for extension cord inspections this month?

Green