Encroachments
Estimating
Liability Determination
Report of Investigation
Other
100

Pole, poleline, pipe, pipeline, conduit, cable, aqueduct or other structure and appurtenance thereof.

What is a Utility?

100

First draft is at Project Initiation Document/Project Study Report stage.

What is a Conceptual Cost Estimate/Datasheet?

100

Rights such as fee, easement, franchise, state water codes, license and trespass.

What are occupancy rights used to determine liability?

100

Report of Investigation (ROI)(form/RW 13-3), Color coded ROI relocation map, Owner's Claim Letter, Owner's Estimate, E-76 and FHWA Specific Authorization, when required, Draft Notice to Owner & Utility Agreement.

What is a Liability Package (ROI Package)?

100

Coordination, Communication and Collaboration.

What are the 3 C's?

200

Any non-highway facility or use, which is in, under or over the highway.

What is an encroachment?

200

Historical data, As-built, utility facility maps,field review and permit records.

What are resources for Estimating?

200

Sections 7034 and 7035

What are the Water Codes?

200

Legal document, precise and detailed, basic relocation requirements.

What is a Notice to Owner (NTO)?

200

Physical and Policy.

What are the two types of conflict?

300

Tries to prevent: damage to the highway, unsafe placement or servicing of facility.

What is the Encroachment Policy?

300

Buried phone lines through Archeological area, Sub-Station, Schools, Churches and Cemeteries.

What are potential schedule busters?

300

Authorized by S&H 707.5 and offered to all Utility Companies.

What is the Freeway Master Contract?

300

Used as a contract to pay, required any time the State or LPA pays a portion of the cost.

What is a Utility Agreement (UA)?

300

Documents used to convey Utility Owners prior superior rights within the Right of Way.

What are the JUA/CCUA?

400

There is no reasonable alternative, the encroachment is not adverse to traffic safety, there is no freeway access for servicing through a fence from a private property or from an adjoining local road.

What is the Encroachment Policy Exceptions?

400

A high level estimate with limited resources.

What is a Conceptual Cost Estimate (CCE)?

400

Street and Highway Code that applies Franchise in the highway.

What is Streets and Highways Code 680?

400

Where-As Agreements such as wasted work and Liability in Dispute.

What are Special Agreements?

400

A formal, legally binding contract between the State and a City, County or any other public non State entity whereby the parties to the Agreement agree to either share or "cooperate" in a project.

What is a CO-OP?

500

Utility facilities running parallel to and within the right of way.

What is a Longitudinal Encroachment?

500

A factor used to determine the increase in cost per year.

What is the Escalation Rate?

500

23CFR645

What is Federal Regulations for Utilities?

500

Letter from Utility Owner, specifying the occupancy rights, date of installation and relocation plan.

What are Owners proof of liability and estimate?

500

Additional unanticipated utility facilities found during construction. 

Completed relocation cancelled as a result of a change in construction.


What is discovered work?

and

What is wasted work?