FMEA
Control Charts
8 Wastes
Causal Analysis
C&E
100
A hard to Detect Score

What is high or 10?

100

The equation for the Control Limits

What is 3 Sigma above/below the mean?

100

The movement of people

What is motion?

100

The neighbors criticize, impugn, question my cotton oak tree.

What is Fault-Tree?

100

The head of the Fishbone

What is the project Y?

200

The RPN equation

What is Severity * Occurrence * Detection?

200

The first analysis step if one has out of control point(s)

What is determine Common/Special cause?

200

Idle time

What is waiting?

200

Reading English and Cause Maps read this way

What is Left to Right?

200

The Fishbone and C&E Matrix have this purpose in common

What is filtering X's?
300

The number of Failure modes a belt should address.

What is exhaust or all?

300

The Control Chart with subgroups >8

What is Xbar-S?

300

Does not conform to customer needs

What is defects?

300

The number of Q&A's in the 5 Why tool

What is at least 5?

300

The alignment of this C&E matrix attribute and your project Y defect

What is the weightiest attribute?

400

The purpose of the FMEA

What is filtering to KPIVs and creating remediation actions

400

The Control Chart for M&M MSA activity

What is U Chart - (Defects per unit)

400

Named after me

Who is TIMI WOOD?

400

The three causal analysis tools taught

What is 5 Why, Cause Mapping, Fault-Tree?

400

The correlation score given to the type of measuring spoon and time to make a donut.

What is zero?

500

What DMAIC phase is FMEA used?

What is Analyze then Improve?

500

The purpose of a Control Chart

What is evaluate process performance over time.

500

The worst type of waste

What is Overproduction?
500

The biggest mistake when conducting causal analysis

What is the Answer not addressing the Question?

500

First best choice if C&E matrix has little differentiation in its' output

What attribute/characteristic is missing?

M
e
n
u