AC PDU
What is Alternating Current Power Distribution Unit
How much does a launcher weigh?
What is 43,000 lbs
Where do you place the R/S and C/S chock blocks when chocking the HEMITT?
C/S: place one chock in front of wheel on number two axle and one behind wheel on number one axle.
R/S: place one chock behind wheel on number two axle and one in front of wheel on number one axle.
Enables 24VDC power to the truck electrical system
What is 24 V BATTERY DISCONNECT Switch
LCCU PS
What is Launch Control Computer Unit Power Supply
The THAAD missile round contains what kind of explosive?
What is Class 1.3 explosive
Approved hearing protection must be worn when working within a BLANK radius of the Launcher
16 ft (4.9 m)
Used to raise and lower the MRP-T. These operate with the engine at low idle until the deck reaches 10 degrees, then goes to high idle
What is Deck Erection Cylinders
ADUIL-JB
What is Azimuth Determination Unit Interlock Junction Box
After you locate the A2/A3, Circuit Card Assembly (CCA) within the Launcher Computer Control Unit (LCCU) A2/A3 slot
What is the next step?
What is Locate faulty V Hard Drive Assembly, on top of A2/A3 CCA
Where is W414 and what does it do?
What is J2 Connector, and It is the main umbilical between the MRP-T and the Launcher. Also provides composite interlock data for processing by the VIM
Used to power the ground rod driver, to engage and disengage the MRP-T rack locks, and to control deck erection cylinders for raising and lowering the MRP-T
What is MRP-T Hydraulic Controls
DAGR
What is Defense Advanced Global Positioning System (GPS) Receiver
After you locate the CCA within the LCCU A4 slot
What is the next step?
What is Loosen the top, then bottom, wedge lock screws one full turn
A minimum of BLANK of firm level terrain is required for MRP-T unload
What is 100 ft (30.48 m)
Allows for 24VDC auxiliary power connection for starting the generator
What is SLAVE RECEPTACLE
UIA
What is User Interface Assembly
After you grasp the handle on the KG-175D, and loosen the bottom screw on the chassis with screwdriver
What is the next step?
What is Pull the sled from the rack and inspect pins and connectors
What piece of equipment weighs more than 42 lbs. (19.05 kgs) and requires a two person lift
What is the Under Run Bumper
Used to provide data communication between the Launcher and control centers
What is TFOCA II Connector