Inflation/Budget
Phases
ACRN
100

This is the definition of Inflation

An economy-wide increase in the average price level

100

This is the Milestone conducted prior to the EMD Phase

What is Milestone B?

100

SEWIP

Surface Electronic Warfare Improvement Program

200

This is the type of dollar provided in Task Planning Sheets (TPSs)

TY$

200

This effort is commonly de-scoped from EMD contracts in order to meet cost and schedule objectives/thresholds

What are EDM quantities?

200

EDM

Engineering Development Model

300

This is the type of dollar shown in Program Funding (Spruill) Charts

TY$

300

This is when O&S begins

What is upon the fielding of the first system(s)?

300

OEM

Original Equipment Manufacturer

400

These are the appropriations of funding that are utilized during the O&S phase

What are PO OMN, Fleet OMN, MPN, OPN

400

This is the event that has shifted that has ultimately caused the SEWIP Block 3 FRP DR to shift to the right

What is IOT&E?

400

MCA

Major Capability Acquisition

500

This is the PPBE phase that occurs 2-3 years prior to FY execution

What is Programming (POM)?

500

This is the scope on the SEWIP Block 3 EMD contract

What is 1) Preliminary Design, 2) EDM, 3) LRIPs 1 & 2, 4) Engineering Services

500

DMSMS

Diminishing Manufacturing Sources and Material Shortages

M
e
n
u