Hirschi Contracts
Spreadsheet
Permits
100

What job in the last two months had 4 estimators bid on it?

Palm Eastern

100

What is the factor on water barrier and backfill?

1.5

100

Who submits permits for the A-Team?

Evelyn

200

How do we celebrate when we get a contract?

RING THE BELL

200

In the structure sheet, what percentage of grout is automatically picked up?

105%

200

What should the PE (Evelyn) be doing the whole time after she submits a permit?

Checking for corrections/progress of the permit

300

Who is the signer of contracts for the Commercial team?

Brandon Marchant

300

What is the markup/GM that is is on the change order tab?

15%

300

When do you have to request an update letter for a soils report?

If it is over 1 year old.

400

What is a very common additional add the General Contractors put into contracts that we do not pick up unless we provide an alternate for it?

Overexcavation

400

What piece of information on the retainer tab or screen walls tab gets missed sometime by Greg or Haden. Evelyn needs this information to submit a permit?

Engineering 

400

What is the site map bubbled in red called?

Marked Plan

500

What two characters are put after the proposal number when you send your first change order to the client?

A1

500

How long of a stretch of wall do we need to have to be able to run our walls at a type 3?

450LF

500

What specific thing do you have to send to North Las Vegas for permitting?

Wall Design