Risk Management
Safety
Cost Management
Contracts
Culture
100

Equipment, labor, and notes are part of this task.

What are daily logs

100

The US Federal Agency that sets and enforces workplace safety standards  

What is OSHA

100

This document is used to list initial contract values, track allowances, alternates, contingencies, and changes.

 What is a Cost Management Log

100

The term "GMP" is an acronym for what type of contract?

What is a Guaranteed Maximum Price

100

Habit #1

What is Be Proactive

200

The standard umbrella value ($) that CCC requires with subcontractors who perform work on our projects 

What is $2,000,000


200

The chapter for steel erection standards and procedures within OSHA 1926 manual.

What is Subpart R?

200

A process that analyzes products or projects to improve their value and reduce costs. It's often used during the design phase. 

What is Value Engineering "VE"

200

Project numbers starting with 94 and 95

What are service contracts

200

Important but not urgent


What is Quadrant II (Plan)

300

List at least 3 types of subcontracts that require Pollution Coverage on their Certificate of Insurance

What are Excavation, Mechanical, Enclosures (window, siding, roofing, EIFS), Abatement, Demolition Contractors.


300

When excavating a hole or trench, the edge of spoils pile must be ______ away from the edge of the excavation

What is 2 FEET

300

Information Technology, General Equipment, Project Management, Builders Risk, General Liability Insuranc

What are the standard markups included in our estimates

300

The day of each month billings are due to Owner

What is the 3rd business day of the month

300

CCC has been in business ____years 

What is 75 Years

400

This part of a standard contract outline the fundamental terms and responsibilities of all parties involved, ensuring a shared understanding of project objectives and operational framework. 

What are General Conditions of the Contract

400

PPE is an acronym for...?

What is Personal Protective Equipment


400

A predetermined amount or percentage of the budget set aside to cover unforeseen costs, risks, or changes that may arise during the project lifecycle. It acts as a financial cushion to help projects stay on budget and on schedule.

What is Construction Contingency

400

The term "CD's" refers to what standard construction exhibit 

What are Construction Documents

400

CCC's tag line and pledge to clients

What is Quality Experienced

500

A contractual agreement where one party promises to compensate another party for losses or damages. It can also mean protection against a financial liability.

What is indemnity

500

GFCI Stands for what?

What is a Ground Fault Circuit Interrupter

"GFCIs are safety devices that protect people from electrical shock by shutting off power when they detect a ground fault" 

500

The indirect expenses and overhead costs associated with the project. These expenses are not directly related to the construction work itself. Instead, they include administrative costs, bonds, testing, staffing, equipment rental, and temporary utilities.

What are General Conditions costs

500

That date of which an Owner can occupy and use their building for its intended use

What is Substantial Completion

500

A typical CCC design-build approach cycles through ____phases to deliver projects on time and on budget with full transparency.

What is 7 phases

Feasibility, Phase 1 Development, Phase 2 Commitment, Phase 3 Bid Docs, Phase 4 Construction, Post Construction, Warranty