NAME THE 3 COLORS ASSOCIATED WITH THE EVERSOURCE LOGO FROM TOP DOWN
BLUE
GREEN
RED
TRUE/FALSE
ONE BOLT CONNECTIONS ARE ALLOWED FOR USE ON PRIMARY TAPS
FALSE
TRUE OR FALSE IF YOU ARE WEARING A HARD HAT MUST YOU WEAR SAFETY GLASSES.
TRUE
- ISOLATED.
- TAGGED.
- TESTED DE-ENERGIZED.
- GROUNDED.
A TIE DOWN SHOULD BE UTILIZED FOR EVERY _______ FEET OF CARGO LENGTH. PER DISCUSSION WITH DOT OFFICER.
10 FEET
WHEN INSTALLING CABLE MOUNTED FAULT INDICATORS ON UG CABLE, CAN THE INDICATORS BE INSTALLED OVER THE NEUTRAL?
DTR 07.300
NO: WHEN INSTALLING UG CABLE MOUNTED FCI'S THE NEUTRAL WIRES MUST BE PULLED BACK AND RE-ROUTED. INSTALLING THE UNIT OVER THE NEUTRAL WIRES WITHOUT RE-ROUTING WILL RESULT IN MIS-INDICATION.
POLE WEIGHTS CAN BE FOUND WHERE
USEFUL DATA 15.5
MAD DISTANCE FOR 15,001 TO 36,000 PHASE TO GROUND EXPOSURE.
2'7"
PROCEDURE FOR VOLTAGE CONVERSION
EO-1171 (VOLTAGE CONVERSIONS)
THE SWIFT RIVER IS A 25.6 MILE RIVER THAT PARRALLELS WHAT STATE ROUTE.
NEW HAMPSHIRE ROUTE 112 (KANCAMANGUS HIGHWAY)
AFTER WHAT PERIOD OF TIME MUST YOU HI-POT A DE-ENERGIZED CONDUCTOR
48 HOURS
WHEN UTILZING A REGUALTOR BYPASS ARE YOU:
MAKING BEFORE BREAKING OR BREAKING BEFORE MAKING?
MAKING BEFORE BREAKING
WHAT TIMEFRAME SHALL YOU WAIT FOR A CAPACITOR TO DISCHARGE PRIOR TO COMMENCING WORK?
SAFETY MANUAL SECTION 7.19.3
5 MINUTES
PROCEDURE AND OR SAFETY SECTION FOR TESTING AND INSPECTING RUBBER GLOVES?
HOW OFTEN SHOULD RUBBER GLOVES BE AIR TESTED?
ADMINISTRATIVE PROCUDURE (SH-6044) RUBBER GLOVE INFLATOR PROCEDURE.
SAFETY MANUAL (SECTION 6.8).
RUBBER GLOVES SHALL BE TESTED BEFORE EACH DAY'S USE AND ANY TIME IT IS SUSPECTED THE GLOVE MAY HAVE BEEN DAMAGED.
THE #1 NHL TEAM
CHICAGO BLACKHAWKS
PRIOR TO ENTERING AN ENCLOSED SPACE EMPLOYEES SHALL TEST FOR WHAT 4 HAZARDS?
SAFETY MANUAL SECTION 8.8.9
- OXYGEN IS BETWEEN 19.5% AND 23.5%
- FLAMMABLE GASES (LEL) ARE AT OR LOWER THAN 10%
- CARBON MONOXIDE IS LESS THAN 35 PARTS PER MILLION (PPM).
- TOXIC AIR CONTAMINENTS (ABOVE EXPOSURE LIMITS).
PRIOR TO CLIMBING A WOOD POLE AN INSPECTION MUST BE PERFORMED. NAME THE CHECKS THAT SHALL BE PERFORMED PRIOR TO CLIMBING A POLE?
SAFETY MANUAL 7.26.2
- GENERAL CONDITIONS.
- CRACKS.
- HOLES.
- INDICATORS OF PROPER DEPTH.
- SOIL CONDITIONS.
- BURN MARKS.
- HAMMER TEST.
- POLE PROD.
- ROCKING TEST.
NAME 4 ENERGY SOURCES LISTED ON THE PAPER TAILBOARD
- MOTION
- GRAVITY
- MECHANICAL
- ELECTRICAL
- PRESSURE
- TEMPERATURE
- CHEMICAL
- BIOLOGICAL
- RADIATION
- SOUND
What is the proper PPE for gloving 3 phase 9 cals?
EO-1136 sec VI B, references TD 240 which says 20 cal clothing, face shield and balaclava. Also in safety manual sec. 6.6
HOW MANY TIMES HAS THE NEW ENGLAND PATRIOTS BEEN TO THE SUPERBOWL
11 TIMES WITH 6 WINS
WHAT IS FERRORESONANCE AND HOW CAN YOU PREVENT IT.
Ferroresonance is an overvoltage condition that can occur when single phase switching is performed on the three-phase distribution system.
E0-1072
CRITICAL STEP AND VERIFICATION PRIOR TO BYPASSING A VOLTAGE REGULATOR.
IF UNABLE TO VERIFY WHAT STEP MUST BE TAKEN
E0-1040
PLACE REGULATOR IN NEUTRAL.
2 METHODS FOR NEUTRAL VERIFICATION MUST BE PERFORMED PRIOR TO BYPASSING, ONE METHOD MUST BE NEUTRAL DETECTOR.
1) NEUTRAL DETECTOR.
2) NEUTRAL LIGHT.
3) POSTION INDICATOR.
IF UNABLE TO VERIFY NEUTRAL AN OUTAGE MUST BE TAKEN TO BYPASS REGULATOR
WHAT IS THE EXCEPTION TO WORKING 1 POTENTIAL AT A TIME.
7.15.5 Employees shall work only one potential at a time
EXCEPTION: Phasing
NAME THE 6 STEPS TO PERFECT SWITCHING.
1) CARRY THE ORDERS
2) POINT TO THE DEVICE
3) RECHECK THE SWITCHING ORDERS
4) VERIFY THE DEVICE POSITION
5) PERFORM SWITCHING ORDER
6) VERIFY THE SWITCHED DEVICE AFTER SWITCHING.
WHAT IS THE OFFICIAL STATE ANIMAL OF NEW HAMPSHIRE NAMED IN 1983?
WHITE TAILED DEER.