FWP
SUBSAFE / QA
PLNR GUIDE
TRF / 430
MISC
100

A Formal Work Package with OQE

What is a Controlled Work Package

100

An Electoplating Repair Record

What is a QA-17B

100

The first rule of planning?

What is find someone else to do it

100

The name of our Subsafe Director

Who is Chris Mcneil

100

This sleepy-eyed silver fox is our current senior planner

What is Keith Clark

200

A routine job that does not require a WAF

What is an AWR

200

April 10, 1963

What is the date the USS Thresher sank

200

This SWR code is required when material listed on the JML requires turn-in

What is SWR 53

200

When ordering CIM material this is the DWC

Who is C/612

200

When not at work this ship sup can probably be found on a river bank

Who is Joe Mohs

300

Also known as the Shipboard Navy Identification and Technical Consolidated Handbook

What is the SNITCH

300

QA Form blocks designated by this are for E&PD

What are Red Diamonds

300

The out of work sequencing NOTE go in this section

What is the procedure section

300

When ordering CIM material this is the DWC

Who is C/612

300

If work is done on this system it may need to be done in 12 hours or less

What is Missile Gas

400

A revision is required for a change to the scope of work, change to the boundary of the work, change to the testing requirements and this change

What is RADCON
400

When filling out an QA-34, all joints assembled using "assembled per FWP" must include this piece of information from the FWP

What is the FWP step number
400

An extensive cost estimate based on engineering drawings, material lists and/or type ā€œEā€ uniform methods and standards

What is a Class A detailed cost estimate

400

When making a credit card purchase do not go over this amount

What is $10,000

500

The process used for Re-Entry Control exceptions or exceptions to retest requirements for mechanical joints

What is a controlled assembly

500

When spicing an O-Ring is authorized by technical authority, it must be from this material

What is Buna-N

M
e
n
u