Inbound Bench Mark
Outbound Bench Mark
Waste/Productivity times
Safety
100

This is considered a best practice and should be utilized prior to physical syncs

What is a virtual sync board

100

This is a tool that we should be using to track productive time

What is the BMI tool

100

This is the acronym for all types of waste

TIMWOODS!

100

This is a mechanism to evaluate our highest risk areas of the building

what is Gemba

200

A team that comes in early to set up for the next shift

What is the early bird team

200

This is a bucket that Outbound and other departments should not be coding to

What is admin related or what are ghosted hours

200

This type of waste is when we process more then what is needed

What is over production

200

Blank is the metric that measure the perception of safety in our building

what is SLI

300

Prior to exempting feedback you will need to collaborate with BLANK prior to exempting any feedback

What is a Sr leader

300

This meeting is important to understand what our space constraints are. All department heads should be attending

What is space management

300

This type of waste is the movement of "non people"

What is transportation

300

This type of preventative measure is worn by associates and managers daily

What is PPE

400

This type of mechanism is used prior to start of shift (hint) it is not the shift planner

What is a preshift meeting

400

A scrub that should be done weekly

what is a roster scrub

400

Scan to scan measurement of one step or one process

What is cycle time

400

This type of injury can be catastrophic and considered very serious

What is SI or Serious incident

500

This is a mechanism that all inbound should be following while unloading freight. Hint (starts with F and ends with o)

What is FIFO

500

A meeting that discusses the following

Previous day performance, Safety, current day plan, rates


what is the pre shift meeting

500

This formula is the formula for what metric "time available/Demand=Seconds

What is TaKT

500

This tool is used to evaluate safety risk across the building

Safety Risk matrix
M
e
n
u