This license or certification is required as part of the preliminaries before contractors can participate in CAPEX projects.
P3
How much is the threshold for CAPEX mandatory contract creation?
What is the P.Grp to use for non-CAPEX PR more than 500k?
460
P2
What is the 1st step to trigger request for prebid?
0612 - TF
0602 - LIPA
0603 - CF
0604 - CD0
0608 - CPW
471 - CANF
In completing your Technical Evaluation, i should consider commercial bid is shortlisting vendors. True or False
False
False
During implementation, additional scope (e.g., civil works, piping, or support structures) was identified that was not included in the original BOQ. What justification should you prepare.
PR Addendum Memo
What is the SLA (in number of days) for processing WO and CAPEX PR to PO upon receipt of Technical Evaluation.
15 days
Can we use OTV for a CAPEX PO?
What the required retention percentage and the corresponding retention period of CAPEX Services PO?
10% of the project cost; (1) Year after acceptance of the project or reasonable time agreed upon
Given multiple WO requirements, I will consolidate them into one PR with multiple line items per vendor to improve processing efficiency.
Is it required to have a minimum of three vendors invited or participating in every pre-bid meeting?
False
PR Addendum is only applicable for CAPEX projects.
False
Technical Bid Evaluation should exclude commercial and must focus on the bidder compliance to the Scope of Work
True
I need programming services for line A & B, since these are two different areas I create separate PR for it.
False
What are the minimum requirements before we proceed with WO services bidding?
Scope of Work and/or detailed/technical drawings
It is not advisable to engage contractors or service providers to perform CAPEX works/services/activities, if they do not have PCAB license even if they have DO 174 registration. True or false?
True
Second or succeeding addendum of the same project regardless of the value is not allowed.
False
Can a PCAB ‘E’ contractor join bidding for a 10M project?
Who approves PR addendum ≥1M?
Chief Engineer & CFO
What does the Project Lead need to complete after the project is done?
CPES