AFE is currently running OOS incompletes. WIP levels are currently within buffer but you had previously had WIP above max buffer. What is more likely the cause?
Totes are downstacked at JP
At what percent deviation do we need to update Lagrange capacities?
5%
What percentage must an Autoflow detected rate deviate from PPA actual rate in order to apply an OR
+/- 20%
True or False: AF consumes rates from OSP
False, AF consumes HCs from OSP, NOT rates
What else, besides high WIP, can pick throttle be engaged for?
Scanned in excess of 12k
Site calls out "AFE2 tray sorter down" What 2 things should you ask the site for?
What two "families" can TRB be triggered for?
Multis, Singles
What is the standard for addressing risk with your sites? (Pick/Pack %)
Pick 100% / Pack 80%
Where do we find ship dock rates for PDP planning?
Central Ship Dock Standard Rates Page
How long does it take for Autoflow to detect drift (in minutes)?
30-45 minutes (2-3 cycles)
Site calls out SLAM line down/jammed. What Workpool ("bucket") in RODEO would you likely see elevated as a result?
Scanned
TRB will trigger based on what system?
CORA
When is it required to escalate elevated problem solve, and to whom do we escalate?
1k total problem solve; Team Lead
True or False: If generating a plan with ELD off, you should only disable ELD for the current shift
False: ELD must be either enabled or disabled for the entire planning horizon
Site takes a 30 minute break that begins at 09:30. What is the first full pure hour following the break?
10:15-11:15. break ends at 10:00, first 15 min of next interval are trash data since site is still staffing.
Your Shipping Sorter goes down, what paths are mainly impacted?
AFEs/Mix
What is TRB
An automated software that prevents most promise from assigning to specific CPTs based on current due out work
WHat is the units missed threshold at which a COE is required?
500 misses for an interval, or 500 misses for a singles CPT for AR sites (200 units per interval if you're running batchy/TSSL)
The Definition of "Expected Misses" in OSP
What Is the total number of misses based on picks that will not make it to pack by slam pad time
What does Euler do?
Prioritizes Pick assignments based on available capacity, cost, and transportation space
AFE1 is hard down due to a mechanical event with an eta of 3 hours to repair. Besides a WI to adjust hcs and pause AFE1, what other action should be taken in AF?
Disable hardware for AFE1 (confirm with TL before doing this)
Where do Lagrange inputs come from within the OSP planning horizon?
OSP and Autoflow
You are planning your PDP and the site calls out that they have 25 Day 2 NHs and 15 NHs in week 2. At what HC and rate % would we plan the NHs?
25 NHs at 60%
When does the PDP become available to plan in OSP?
20 hours prior to start of that shift
What does CCC do?
Balances the Backlog between certain paths, aligning the ratio of pre-picked shipments