This type of data are counts, binary, attributes nominal or ordinal.
What is Discrete Data?
How do we know what the customer values?
What is Voice of the Customer.
What is a measurement error from one person taking repeated measures of the same part, with the same measurement tool?
What is Repeatability?
This Process Map is called?
What is Swim Lanes?
What does UCL and LCL Stand for?
What is Upper Control Limit and Lower Control Limit?
What is an example of Continuous Data?
What is Time, Distance, Weight, etc.? Continuous data are measured on an infinitive scale.
What is the difference between Non-Value added (NVA) and Business Non-Value Added (BNVA)?
What is BNVA is truly NVA, but done for regulatory reasons or to keep the lights on.
What is a measurement error from two or more people taking repeated measures of the same part with the same measurement tool?
What is Reproducibility?
What does SIPOC stand for?
S = Supplier
I = Input
P = Process
O = Output
C = Customer
This step realizes the relationship between Voice of Customer (VOC) and Voice of Process (VOP).
What is Process Capability?
These are two ways to choose a sample.
What is randomly and systematically?
What tool can be used to depict Value Add on the Value Stream Map?
What is a time line with Customer Value Adds (CVA) activities in the lower steps and NVA or BNVA activities in the upper steps.
Defects (noun) can be counted and there can be multiple.
Defective (adjective) It describes what is wrong with the product.
This process map shows the work flow through various departments or work areas. Best used for finding inefficiencies in the layout of the work area.
What is Spaghetti mapping?
What does DPMO stand for?
What is Defects per Million Opportunities?
What are three of the five things to consider when building a data collection plan?
Process or Population
Data Type
Objective
Familiarity
Certainty
What are the 3 C's of Customer Value Add?
What is Cares, Change and Correct.
Why do we need to know what kind of data we have to use a control chart?
Different Chart are used for attribute and continues data. We need to use the proper one to get the proper reading necessary to determine process stability.
This process map expands from the SIPOC to get to an area of focus. Best used when trying to redefine the scope.
What is Top-Down Process Map?
What popular dance was discussed in yesterday’s class?
What is the Nae Nae?
In continuous improvement, we talk about these three voices of data.
What is Voice of the Customer (VOC), Voice of the Business(VOB) and Voice of the Process (VOP)?
What does the acronym TIM K WOOD mean?
What is Transportation, Inventory, Motion, Knowledge, Waiting, Over-processing, Over-production, Defects
What are the steps in the 3 step dance?
What is Measurement System Analysis(MSA,) Statistical Process Control (SPC) and Process Capability?
This process map depicts the process showing the flow of material and information required to deliver a product to customer. It contains data and flow not typically shown on other types of process maps.
What is Value Steam Mapping?
What are the four deliverables for the Measure Phase?
Data Collection Plan, Output/Input Metrics, Measurement System Analysis, Baseline Performance (Control Charts to validate process stability and process capabilities analysis)