The transfer of intended meaning.
What is communication?
Separator between the interior and exterior environment.
What is building envelope?
This mortar type of medium strength is common in construction.
What is type N?
A cut-through view of the building or object.
What is section plan?
ACI 302.1R-96
What is guide for Concrete Floor and Slab Construction?
Have a clear understanding of common targets.
What is teamwork?
Can replace 1/2 of the required amount of Portland cement in concrete mix.
What is fly ash?
FE
What is fire extinguisher?
Should be referenced in addition to plans and specifications.
What is submittals?
40% to 60% of concrete wall cost.
What is formwork?
The Three C's - Capital, Character and Capacity.
What are subcontractor qualifications?
Soil type that is plastic, sticky and feels smooth and greasy.
What is cohesive soils or clays?
It runs downhill.
What is sanitary sewer and storm drainage?
The amount of time a task can be delayed in a schedule.
What is float or slack?
One cubic yard of concrete.
What is 27 CF or about 4,400 pounds?
Gives structure to the construction process.
What are schedule and goals?
Sets the design standards for fire protection.
What is NFPA?
Gas pressure range.
What is 20 psi to 50 psi?
Working from a target completion date (milestone) backwards.
What is pull planning?
The most common type of curing concrete.
What is dissipating curing compound?
Members can express their feelings and ideas.
What is an effective team?
Amount of tons required to cool 1,050 SF of office space.
What is 3 tons?
Material's thermal resistance to conduction heat transfer.
What is R-Value?
Site is stabilized.
What is reason to get Notice of Termination of SWPPP?
85% of Concrete Compressive Strength.
What is first 7 days?