A step by step guide using images and instructions to perform a task safely, correctly, and consistently
What is Visual Operating Procedures
This is used to maintain traceability of any safety observations
What is the Observation Tracker?
This winding machine uses wire, not strip, while the other uses strip and not wire.
What is the PT and Reactor winder machine?
This statement is a summarization of our Quality policy
What is I Own Quality?
This routine is conducted following each shift to ensure a safe, clean, and functioning work environment
What is 5S+?
A guide that displays how much material to use, where to put it, and how to wrap it to produce a coil.
What is a winding sheet?
These are the four main PPE requirements for Coil Winding
What are safety toes, safety glasses, ear protection, and sleeves?
This form is completed daily prior to operating any hoists or cranes
What is Crane and Hoist Checklist?
A label that is required on all tools and calibrated materials prior to its usage on the production floor
What is a Calibration sticker?
This product/device keeps electrical voltage steady at a safe level.
What is a voltage regulator?
An EHS approved document used to capture processes that fall outside of normal procedures and must be signed by individuals prior to completing task
What is Nonstandard Work?
This 3-word phrase reflects Eaton's safety mindset and principles.
What is I choose Zero?
This machine cuts the ETR strips
What is the 4-Bar slitter?
List the Quality Rules of Engagement
What is 1) Training and Qualification, 2) Standard Work & Compliance, 3) Error Proofing Devices, 4) Data Integrity, 5) Process Deviation, 6) Material Control?
These three phrases reflect the new Eaton Culture Model
What is Think Big, Act Boldly, and Win Together?
This set of principles is violated when documents are falsified.
What is the Code of Ethics?
List all of the Life Saving Rules
What is 1) Fall Protection, 2) LOTO, 3) Confined Space, 4) Seat Belts and Restraints, 5) Arc Flash, and 6) Machine Guards and Devices?
This machine helps achieve the appropriate E-dimension required for the coil
What is the Coil Press machine?
When parts fail quality checks, they are sent to this location for review and disposition.
What is the MRB area?
This product/device changes electricity to the correct level for everyday use.
What is a single-phase transformer?
A required document that confirms a process works as intended and consistently makes good parts.
What is a Process Qualification Plan?
For a storm, fire, or active shooter situation, employees should go to these locations and/or follow these actions.
What are restrooms, outside assembly points, and run, hide, and fight?
List the amount of Main Winding, PT Winding, and Reactor Winding machines we will be receiving
What is 2 Main Winders, 1 PT Winder, and 1 Reactor Winding machine?
This type of event is performed to verify compliance with company procedures and standards.
What is an audit?
This government organization sets and enforces workplace safety rules to protect employees across various industries and agencies.
What is OSHA (Occupational Safety and Health Administration)?