Add- Ons
State Guidelines
Sales Ops
Design
Trinity Trivia
100

How many months after PTO of original system do we need before we can proceed with an add on system? 

12 months

100

What is the max system size we can build to before an additional homeowner's insurance policy is needed?

11.7

100

What are the 4 teams in Sales Ops

Contract Writing, Communications, Timeline Management, Document Processing. 

100
What is the minimum number of panels we can have on a detached structure. 

6

100

Who is the CEO of Trinity Solar? 

Tommy Pollock

200

What is the minimum system size for an add on panel?  

2.025

200

In Connecticut, what is the max AC system size we can have if there is less than 12 months of usage on the electric bill? 

9

200
Who are the directors? 

Lauren English (SR. Director), Mae Yenger, Jess Tauscher, and Vicki Broszeit

200
In which state do we need to design panels in a landscape orientation on a metal roof? 

Pennsylvania 

200

What year was the company founded? 

1994

300

Can we add panels to a roof with existing panels that is not following setbacks rules. 

No, we would have to design on an empty roof. 

300

How many panels can we use on a 10K inverter in Massachusetts? 

38 Panels 
300

What stages of a deal does Sales Ops work with? 

Stage 2 through Stage 10

300
In Pennsylvania, what are the orientation degrees we cannot design to unless asked by the rep in the DL notes?  

290 degrees to 70 degrees.

300

Trinity was not always a Solar Energy Company, what industry was the company in before solar? 

Heating and air. 

400

For One Energy Companies (Met-Ed, JCPL, Penn Power, Penn Elec, West Penn Power) how many months of electric bills do we need for an add on system. 

12

400

For Atlantic City Electric, what is the inverter calculation? 

Annual usage/ 1.2

400

Who is the manager of Communications and who is the manager of Document Processing? 

Comms- Scott McDermott. Document Processing- Luke Grady

400

What is the AC system size for a 5 (405watt panels) system? 

1.450

400

What year did Trinity enter the solar industry? 

2004

500

In New Hampshire, what is the max offset we can build to before approved is needed and who can approve this? 


1.80% 

2. Christian Toebe and Kevin Erbe

500

What does TSRF stand for? 

Total Solar Resource Factor

500

We have over ______ installs. 

100,000