What type of data is maintained in the CTPL?
What is, Technical Data.
PEMA system software will be updated no later than how many days after receipt?
When is, 10 working days.
How many different MAINT reports are there?
What is, 6.
The first inspection interval for inspections based on calendar time commences on the date of what?
What is, DOD acceptance check flight.
When aircraft return to reporting custodian upon completion of PMI, the new base date for special inspections performed as part of PMI will be when?
When is, The date aircraft completes SDLM (MISC History entry required).
Management of CTPL is the function of what Division?
What is, Quality Assurance.
How long must copies of TD/IRAC weekly summaries be maintained on file?
When is, 6 Months.
What does the MAINT-2 report show?
What is by aircraft BUNO, the total number of discrepancy hours limiting the equipment from performing its mission or function during the reporting period. This report also denotes equipment utilization.
First inspection interval of those inspections based on flight hours, operating hours, cycles or events accumulate prior to what?
What is, Navy acceptance.
What is the purpose of a Pre-phase Inspection Meeting?
What is, Prepare changes to Sequence Control Chart, including TD compliance, any additional maintenance requirements, and plan for replacement of SRC items and other required material.
How do you correct a deficiency in a Technical Manual?
What is, a Technical Publication Deficiency Report (TPDR).
Which website is the authorized source for NAVAIR Electronic Technical Manuals?
What is, NATEC.
What does the MAINT-3 report show?
What is, displays SCIR hours by mission category and AWM hours by reason codes summarized for a given EOC code and associated WUC during a reporting period.
When will a phase or engine major inspection be a requirement of SDLM or special rework?
When is, specifically requested by reporting custodian and approved by TYCOM and COMNAVAIRSYSCOM.
When is a plus 10% deviation not authorized?
When is, LCF “LOW CYCLE FATIGUE” limited items have reached there assigned cycles or operating hours. Or when Structural Life Limited Items have reached their basic life limitations or would reach during the extension, as well as components prohibited by the applicable PMIC.
What is the deadline for incorporation of IRACs, RACs, and ERACs?
When is, 2 days of receipt.
What do PMS publications consist of?
What is, MRCs, SPCs, PMICs, SCCs, and standard rework specifications.
What does the MAINT-4 report show?
What is, shows mission capability and maintenance data for each MAF or WO submitted for a given EOC code and associated WUC by aircraft BUNO within Assembly Cd and ORG code.
When is Depot Level not required to accomplish special inspections?
When is, special rework is performed at reporting custodian’s site.
The certification of performance of turnaround and daily inspections is made on what?
What is, Preflight/Daily/Turnaround/Postflight Maintenance Record (OPNAV 4790/38).
What is the deadline for incorporation of formal changes, routine revisions and notices?
When is, 5 days.
What is used to establish a Technical Publication Library?
What is, Initial Outfitting List (IOL).
What does the MAINT-5 report show?
What is, data on DMMH or FLTHR for aircraft assigned to a unit during the selected reporting period.
What publication used for aircraft preservation when there are no MRCs?
What is, NA 15-01-500.
How long is a Turn around on an aircraft good for?
What is, 24 hours or until major maintenance is performed.