Procedures
Anything Goes
100

How many days after the issuance of the Notice to Proceed does time start?

14 days or when work starts whichever date is earlier

100

True or False:  MRP's are performed quarterly

False

200

According to procedure 850-070-001-e (Contractor Non-Responsibility for Maintenance Contracts) what is the operations office responsibility if non-responsibility conditions exist for a contractor

Review and document the circumstances and notify the District Maintenance Engineer (DME)

200

We have 30,092 of this particular characteristic along our District's state roads

Street Lights

300

True or False:  Periodic Maintenance Inspections of Crash Cushions and Guardrails should never be performed within Construction Zones

False:  Procedure 850-000-005-e (Maintenance Responsibilities within the Limits of Construction Projects) states that these inspections must still be performed within the limits of the construction projects

300

When is Gene's first day of Retirement?

January 1 2023

400

According to procedure 375-000-005-e (Performance Based Maintenance Contracting), how is the Final AMPER Score recorded in PrC calculated?

The Final Score is calculated by averaging all semi-annual AMPER scores after dropping the highest score and the lowest score.

400

What are the four facility types measured by MRP inspections?

Rural Limited Access, Rural Arterial, Urban Limited Access and Urban Arterial

500

According to Procedure 850-070-002-c (Contractor Field Performance Rating), how long does the project manager have to complete the Final CFPR

20 business days after all required closeout documents have been received from the Contractor.

500

How many days does the Contractor have to turn in a completed 21-A?

According to Procedure 375-020-002-I (Maintenance Contract Administration, Inspection, and Reporting) The contractor has 90 Days from the Final Invoice submittal.