CA/ MCAs
SAP
Resourcing/ Bank Builds
Wild Card
Random Ruckus
100

Starting under what severity level should we push back on the change action?

What is severity 1 and 2

100

Included in MB5B inventory calculation 

What is blocked stock

100

I am the reason why we need a bank build

What is tool modification or resourcing

100

None-useable stock post change. What is our action?

What is OMRB

100

This Jira project manages the resourcing activities and discussions.

 What is CMI

200

What should be the source of truth for production volumes when planning a change? 

What is POM1

200

Use this code to view the BOM for plastics, body, sub assemblies, fastener collectors. 

What is CS03
200

True or False- ECM must validate that demand  has been cut off to the old supplier 

False

200

This application will replace required OBOM validations for R2.

What is MARS

200

Changes to the MPL

What is RBCM

300

Required to successfully update the BOM from an MCA approval.

What is P1 Status

300

Variables for dynamic safety stock

What is daily average requirements multiplied days on hand.

300

A tool move under the same supplier but to a new location? 

What is SREA

300

A written document that releases temporary solutions into production. 

What is deviation

300

Tool downtime, PPAP timing, forecast MPP changes, quality fallout rate at GA, EOL, and supplier, and service requirements are the responsibilities of ECM when supporting this activity.

What a supplier resourcing

400

Material ready time, dimensions, weight, number of pallets and ship from location

What is expedite quote

400

This T code can be used to be find the parts list per VIN. 

What is ZPP_OBOM_VAL

400

Once resourcing has started this document will require ECM approval. 

What is termination letter  

400

Does not a require a CA release to kick off discussions

What is resourcing 

400

On average what percentage of data is missing from SAP OBOM to MES that requires our team to run validations?

What is 30%

500

Before approving this type of change, the approver must confirm that all impacted stakeholders are aligned to the change and content is under the same CR.

What is coordinated change

500

This access node is used for R1 Gen 1 products

What is AN_R1T_PPSOP

500

This percentage must be factored in bank requirements to consider fallout and delays

What is buffer 

500

In the PD application for protype master data, this column should be used to determine quantity requirements for PV and MVB. 

Build QTY/ Build QTY to order (whatever is higher) 

500

What program specific suppliers are not included in EKanban

What is DCFC/ EDV