Equipment/Variations
Project Management
Transition
COJO/Pricing
Submittals
Miscellaneous
100
Where do we get product records?

GAM Ship History either in Comfortsite or from the GAM email

100

What are the minimum required documents to notify a job?

Final Proposal, Price Roll Up, Customer Purchasing Document

100

Who can initiate a transition meeting?

Anyone involved with the project. If you are uncomfortable with the job or still have questions, anyone is allowed to call for a transition meeting.

100

Who is responsible for balancing a job?

Project Managers are responsible for balancing the job using the CVA calculator. Estimators are responsible for making sure a job is under the PO value when COJO values are entered. Both are able to get a COJO when needed.

100

Should you commit a project when there are qty 300 of one type of VAV box?

NO! Wait for it to be broken out and submitted by an estimator.

100

Can we create a CVA without having all of the vendor quotes?

Yes. Balance the job based on current variation allowances. Small variances can be absorbed into the margin or split/closed during closure.

200

Variation quotes are typically found where?

On the specs drive in the variation folder. This should be updated and purged of old quotes. Responsibility is on the AS.

200

Who should be included in a notification?

Project Manager, Estimating Team Lead, ASM, QB

200

What are 3 required questions in a transition meeting?

Project Timeline

Special Requirements

Final Finisher

Customer Expectations

200

How long is a proposal price good for?

30 days

200

Where can you find the filter information for RTUs or Air Handlers?

In the submittal or in a catalog.

200
  • Should budgets in People Soft be lump sums for Material or Labor?
  • No. Budgets should be itemized to reflect individual material and labor allowances to assist with Project Closure Review Process.
300

Describe CPS and the process.

Chiller Pro Support

Required on every chiller with GSM approval to remove.

It allows service to maintain a chiller for a year in order to create linkage after the warranty is over.

300

How do you handle a missed scope on Trane equipment and on variation?

Trane Equipment - No Charge SPA except for extended warranty.

Variation - Variation Underage

Ask the AS if there was a reason or direction from an account manager

300

What is the difference between an estimator and an application specialist?

Estimator works up proposals for bids.

Application specialists create submittals.

300

If lead time is passed the initial ship quarter on the COJO, what is the add for extending to the needed date?

1% per quarter

300

If there is an approved as noted submittal, who makes the changes to the equipment?

PMs, if comfortable.

Ultimately, it's on the AS.

300
  • How can a PM prevent return trips for start-up tech, due to lack of power supply on a job?
  • Obtain completed copy of pre-start check list from the customer. (If jobsite does not have power, get PO from customer for the trip.)
400

RAUJs require TXVs and refrigerant specialties. These quotes are provided by whom?

Account Manager with service approval. An estimator or application specialist are not responsible.

400

What documents are required for a project close out?

Warranty information and IOMs are required to give to the customer.


Service and parts contacts.

400

After a job folder is notified, what happens to the job folder?

The Project Manager moves it from the specs drive to the $booked projects folder under the correct year.

400

Who has pricing authority for jobs located in West Texas?

Bob Doyle

400
Who is responsible for submittal review?

EVERYONE!

PM, Estimator, AM

400
  • Should variation allowance be made for start-up assistance on VRF systems?
  • No. Jay and Kelly currently provide this as a value-add, customer training experience.
500

What is MOPP-SLPL-34B?

This MOPP determines the mark up on variations based on Trane equipment multipliers. The CVA calculator is used by a PM to determine markups.

500

What are the three pillars of project management?

Price, Timeline, Scope

500

Name 5 types of documents you can find on the Texas Equipment HUB.

Price Sheets

Standard Work

Contact Information

SPA

Project Management

500

Who is responsible for getting an updated COJO if there is a price increase with no bill of material changes?

Project Manager

500

At what point can you commit a job without a submittal?

When you have sales manager approval.

500
  • On which proposals should verbiage for the ADP offering be included?
  • All proposals. Calculations by the AM, however, are only on $500K or greater.
600

Name 7 curb manufacturers

Thybar

TECO

CDI

Canfab

Micrometl

CurbsPlus

KCC

Factory

600

At what point is an AS completed with an assigned project?

Never. They should always be available to be reengaged as needed throughout the life of a project.
600
  • Who issues the PO for warranty Trane Parts?
  • Customer. Financial responsibility (and any core returns) should reside with the customer.
600

When a job is transitioned from an estimator to a PM after submittals are created, what three things should have occurred?

Current COJO is up to date with BOM
Project Folder is completed
Roll Ups are set to COJO levels with correct variation quotes

600

Who is responsible for creating the VRF submittals?

The VRF team

600

Who is taking the winning group to lunch?

JR!