What is $700 Million
G3 Terminal Manager
Who is Nick Willcox
Number of contractors that were involved with building the project (including Kiewit as the GC)
What is 9 contractors
Amount of tons of structural steel on G3TV
What is 7,500 tons
The two products that G3TV had to design their performance tests and guarantees for
What is wheat and canola
What is Ibberson, Western Canada and Kiewit Industrial Engineering
A privately run corporation that owns and operates Canada’s civil air navigation system
What is NAV Canada
The document that aligns management of Client, contractors and subcontractors with their counterparts
What is a Zipper Plan
Number of months commission schedule was shorten due to ship loading boom issue
What is 6 months
The magnitude of commissioning punch list items
What is over 10,500 items
The phase of job that the team focused on development of preliminary scope, conceptual design, and project parameters that fostered relationships with client
What is Early Contractor Involvement (ECI)
Number of subcontractors and vendor were on G3TV?
What is 200+
Peak number craft and staff that were involved with building G3TV
What is 570
What is subcontracts and material contracts
The major piece of equipment that had to get rebuilt during commissioning
What is the loader
The project finished [Blank] months ahead of schedule overcoming procurement and commissioning challenges
What is 3 months
Business relationships are the [Blank] that exist between all entities that engage in commerce
What is connections
Contractor that supplied specialized labor support
Who is SEK
Groups that projects can use to leverage to mitigate procurement challenges
What is OSSQ and KSN
The team needed to reach [Blank] % of equipment capacity to pass performance tests
What is 100%