Workbook Knowledge
Work Instruction
Communication
Geodis Knowledge
100

What does PFP Stand for?

Paid for Performance

100

True or False: Work instruction and SOPs are the same thing

False

100

The use of words to share information with other people through spoken communication.

Verbal Communication

100

True or False: Is the client able to walk the warehouse floor unaccompanied by Geodis personnel?

False

200

Who is the name of our client in our contract that we used throughout SUP U?

Willie's Outstanding Wonders (WOW!)

 

200

Top level document that provides and start to finish overview of the standard procedures that should be taken to complete the task and achieve the outcome desired.

SOP- Standard Operating Procedures

200

Facial Expressions, Eye contact, waving, pointing are an example of what?

Non verbal communication

200

What is the largest expense in each of the Geodis buildings?

Labor, Wages

300

Cost that change as the quantity of the good or service that a business produces changes.

Variable or Dynamic Cost

300

 A thorough and detailed document that explains exact process step by step including exceptions at the account and function level. It is this document that is audited and must be abided.

Work Instruction

300

Discussion that level set the day, setting expectations, communicate needs, listen to questions, and motivate a group.

Start up meeting or Start of shift meeting

300

What system tracks teammate productivity?

Red Prarie

400

Name 3 different types of contracts used by Geodis

Unit Rate, Open Book, Fixed Variable

400

Pictured visual of the work process based on the WI. Displayed as an easy reference document.

Visual Job Aid

400

Floor opportunity to look for something specific

Gemba walk

400

The productivity operations dashboard is located where?

On the Power of BI

500

What does MOST stand for?

Maynard Operational Sequence Technique

500

What does PEX stand for?

Process Excellence Group

500

What measures engagement, productivity, and inventory?

The productivity Pyramid

500

Who is the senior vice president of Geodis Contract Logistics?

John Williams

M
e
n
u