A topographic survey was done for the project. What company performed it, and in what month and year?
What is PSOMAS, October 2019
What is the f'c of the new footing and pedestal at the satellite foundation?
What is 4,000 PSI?
What is MSG
Metering Switchgear
Name three examples from the energy wheel of hazards posed by a tank of unknown contents being picked by a crane
All but temperature.
The slab elevation of the "Sewer Ejector Room"
110' 4 1/4"
The proposed pavement sections are designed for how many years of service life?
What is 40 years?
What is the elevation of Level 02 – Low Apron?
What is 120'-9 3/8
F3b is a type of light for which location?
Restroom entries
What temperature triggers the need for shade to be provided to all crews on site?
80
On Level 2, the Edge of Slab Dimensions for Elevators 10 and 11 are what?
20' 4 1/2 and 11' 7"
The Isolation Joint Detail shows what 3/4" material between the concrete
Non-extruded premolded compressible material
What beam size is shown at the roof on the Grid S11 moment frame?
What is W27x102
Panel NLP1 (E) FIS is what circuit number
47
What is the required rating for protective eyewear, as part of minimum basic PPE?
ANSI Z87
The LAWA Large Equipment Storage Room on level 2 has this wall type
A261
What is the minimum depth of the concrete foundation for a Type A bollard? Not the modified
What is 7'-6"?
At the typical blockouts in the concrete slab on grade at steel columns, what size and spacing of dowels are required, and what is the minimum total number?
What are #5 dowels at 18" spacing, with 3 minimum per side on 4 sides (12 total minimum)
According to the general notes on the Level 01 – Sector 4F lighting plan, where are homeruns not allowed?
Under a toilet or wet area
A ladder of what length or greater should be lifted by two people?
12 ft
The ceiling type for Hold Room 404 on level 3
MCP-9
What rebar size and spacing is required in the slab at passenger boarding bridge areas?
What is #8 bars at 8" O.C. each way?
For concrete encasement of a steel column in the rectangle column condition, what are the vertical bars and tie size and spacing?
What are (8) #6 vertical bars with #4 ties at 9" O.C.
On the Level 03 – Sector 4F lighting plan, the F4 lighting fixtures to be controlled through what, and which control platform must it be compatible with?
A remote-mounted dimming driver, compatible with the Lutron Ecosystem control platform?
What's the number for Dig Alert?
811
The Contract Number
LAX9010C05