WHAT PROGRAM IS THE OFFICIAL RECORD FOR TXDOT?
SITEMANAGER
WHAT IS THE MINIMUM AMOUNT OF BARRICADE INSPECTIONS REQUIRED FOR A PROJECT?
2 - 1 NIGHT AND 1 DAY
HOW DEEP IS SILT FENCE FABRIC EMBEDMENT?
6 INCHES
WHAT DOES CSJ STAND FOR?
CONTROL SECTION JOB
TRUE OR FALSE:
DIONNE CAN GET DENNIS TO ENTER A DWR WHILE DIONNE IS VACATIONING IN JAMAICA.
TRUE
WHEN USING A PCMS FOR A 2 WAY ROADWAY, WHERE ARE THE BARRELS SUPPOSED TO BE PLACED?
2 BARRELS IN FRONT AND THE BACK OF PCMS
HOW DEEP IS A ROCK FILTER DAM EMBEDDED?
4 INCHES
TRUE OR FALSE:
NORTH ARROWS ARE REQUIRED ON ALL PLAN SHEETS.
FALSE - ONLY NEEDED FOR SHEETS THAT HAVE MAPS OR PLAN VIEWS
TRUE OR FALSE:
DUKE JUST FINISHED INSPECTING A TRAFFIC SWITCH THAT STARTED ON MONDAY NIGHT AND ENDED ON TUESDAY MORNING. DUKE WILL ONLY HAVE TO DO ONE DWR FOR THIS WORK.
FALSE - 2 DWRS WILL HAVE TO BE DONE...MONDAY NIGHT'S WORK ENDS AT 2400 HOURS (MIDNIGHT OR 12AM) AND TUESDAY'S WORK STARTS AT 0000 HOURS (12AM)
TRUE OR FALSE:
A NEWLY MOUNTED SIGN THAT IS 10 FT FROM THE BOTTOM OF THE SIGN TO THE EDGE OF TRAVEL LANE IS INSTALLED CORRECTLY.
FALSE - IT SHOULD BE 7 FT - 9 FT
WHAT FORM IS DESIGNED TO HELP WITH SW3P COMPLIANCE?
FORM 2118
TRUE OR FALSE:
THE BASIS OF ESTIMATE IS INFORMATION ON HOW A DESIGNER COMES UP WITH THE QUANTITIES ON A SET OF PLANS
TRUE
WHAT MANUAL WOULD YOU FIND THE INFORMATION REQUIRED FOR A DWR?
CONSTRUCTION CONTRACT ADMINISTRATION MANUAL (CCAM)
TRUE OR FALSE:
A SIGN SHOULD BE VISIBLE IN BOTH THE DAY AND THE NIGHT.
TRUE - TMUTCD STATES A SIGN SHOULD BE LEGIBLE AT NIGHTTIME AND DAYTIME
WHAT ITEM COVERS TEMPORARY EROSION, SEDIMENTATION AND ENVIRONMENTAL CONTROLS?
ITEM 506
WHAT SHEETS IN THE PLANS SHOW BARRELS AND CONE REQUIREMENTS FOR A PROJECT?
BC SHEETS
TRUE OR FALSE:
JAMES AND CLARK ARE INSPECTORS ON THE SAME PROJECT AND THEY ARE WATCHING THE SAME WORK OPERATIONS (RCP INSTALLATION). THEY ARE BOTH REQUIRED TO DO A DWR FOR THE WORK THEY OBSERVE.
FALSE - DUPLICATE INFORMATION IS NOT REQUIRED.
HOW TALL ARE THE DELINEATORS REQUIRED TO BE ON LOW PROFILE CONCRETE TRAFFIC BARRIERS?
16 INCHES FROM THE TOP OF THE CTB TO THE TOP OF THE DELINEATOR
WHAT DOES E.M.S. STAND FOR?
ENVIRONMENTAL MANAGEMENT SYSTEM
WHERE CAN SPECIAL PROVISIONS AND SPECIAL SPECIFICATIONS FOR A PROJECT BE FOUND?
THE PROPOSAL (CONTRACT)