The forward deployed element of the FEC that provides a full range of NAVFAC facility and environmental products and services to installations
What is the PWD?
Category of Work (COW) that requires limited design & engineering efforts
What is III?
A contract turnover meeting should occur no later than XX days after receipt of award notification
What is 10 days?
Marks the formal start of the post-award design development process to discuss requirements and events that will occur during the design process for DB
Primary stormwater pollutant at a construction site
What is sediment?
Labor regulation that requires all contractors on Federal contracts over $2k for construction, alterations, or repair to pay their laborers not less than prevailing wage rates and fringe benefits
What is the Construction Wage Rate Requirements Statute?
Obtaining information specific to the item to be acquired and determining whether or not it can be met by something available in the commercial market.
What is Market Research?
The Government enters into two separate contacts: one for design and one for construction
What is Design Bid Build (DBB)?
An IGE is required for any modification expected to exceed
What is the Simplified Acquisition Threshold (SAT)?
A contractor's production report is submitted for every XX days of no-work
What is 7 days?
NFAS implements and supplements the... (3 parts)
FAR, DFARS, and NMCARS
Number of parts in a RFP package.
What is 6?
Approval authority for a SSP before the final solicitation
Who is the Source Selection Authority (SSA)?
Examines project functions and requirements, analyzes alternate design concepts, exposes and resolves project issues, and develops the final conceptual design
What is the Concept Design Workshop (CDW)?
Provides authority to close-out a contract file
What is the contract completion statement?
OSHA General Industry Requirements can be found in
What is 29 CFR 1910
UFGS and UFC can be found on
What is the Whole Building Design Guide website?
Informs offerors of their strengths and weaknesses in their proposals
What are post-award debriefings
Weeks in a calendar year that the contractor's primary QCM may be substituted with their alternate
What is 2 weeks?
Neither acceptance of a facility by the Government, nor the end of the warranty period, will end the contractor's, manufacturer's, or supplier's liability for
What are latent defects?
Has the authority to administer contracts on behalf of the Government
Who is the Contracting Officer (KO)?
Prohibits authorizing and obligation that exceeds the amount available
What is the Anti-deficiency Act (ADA)?
NAVFAC contracts will identify five (5) critical areas that require acceptance testing (name the five)
What are electrical, fire and life safety, mechanical, roofing, and underwater structures?
Notice that must be given for a preparatory meeting
What is 2 days?
System is used to process invoices electronically for NAVFAC contracts
What is Wide Area Workflow (WAWF)?