The machine process used to make a hole more precise is called
Reaming
A force that makes an object rotate about a point is called
pivot force
Which phase best describes order cycle time? From when______ to when _____
elapsed time from customer order to the time product or service is rendered
Mistake proofing a process or design of a product is called? And it is not Pikachu.
Poka - Yoke
A bottleneck constraint is
something that limits system throughput
A drill with a work margin will
drill undersize
A mandatory perquisite for team building is________. Some call it top down.
commitment from top level management
If a company is operating under a continuous improvement environment,which of the following is probably the primary goal? The Japanese call it Muda.
identify and eliminate waste (non-value added)
A workstation needs only two operators to run efficiently but there are general three operators assigned to this workstation. A new product requires a new process and one operator. The manager/supervisor should
reassign one of the operators from the overstaffed workstation
A production schedule can determine whether delivery promises can be met and can identify_____________. I hate when Amazon uses the foam peanuts
when packaging material will be required for a product
The primary purpose of a "first piece" or "production run" is to ensure that the
production specifications are accurately met
Within a company, a metric is used to _____________. Don't step on it or the other team will get the ball.
establish a baseline measurement for process improvements
Calculate the productivity in units per hour of a worker given the following information
12.5
12.5 parts per hour
If a customer requests 100 parts and the team can only produce 80 in the amount of time allocated before shipment, which of the following is the preferred method for the team to use to reduce the shortfall?
re-allocate equipment and human resources
The Japanese use this word for continuous Improvement
The size of a drill is usually stamped on its
Shank
Objectives should be________. Or the second letter of SMART Goals
Measurable
Which of the following is used by companies to maximize the use of available skills in assigning jobs?
training matrix or database
Job assignments should be made By asking whom____________
by asking the supervisor
Management and leadership are both necessary on projects. One typical task of management is to prepare key operational results expected by stakeholders, whereas leadership involves
establishing direction, aligning people, and motivating and inspiring others
When setting up equipment for the production process, it is important that
process requirements and product specifications are met
Team goals should be tied to
the company's business plan
The primary responsibility of a team leader is
knowing all team skills
A lean manufacturing technique that focuses on creating a clean and orderly work area is __________. There is one for every finger
5S
A team should use __________ to solve a non-conforming product problem