What should be done before operating equipment?
Pre Inspection
How many hours of safety training is required for a new surface miner?
24 Hours
LOTO stands for?
Lock out tag out
What is the minimum PPE required to work on an MSHA governed site?
Hard hat, steel toed. shoes, and safety glasses.
______ _______ authority is given to all worker and can save time, money, and lives if used properly?
Stop Work
If you are not wearing this while operating you personally can be fined?
Seat Belt or Safety Belt
How often must miners receive REFRESHER training and what is the duration of this training?
Annually and Eight (8) Hours
According to MSHA regulations, all electrical repairs must be performed by this person.
A Qualified Electrician
What training should be done for any new miner or third party person entering the mine?
Site Specific Training
____________ energy is an example of a "Hidden hazard" that may not be obvious?
Stored or Potential
What should be placed on either side of one tire when equipment is parked?
Tire Chocks
MSHA must inspect a surface mine at least this many times each year?
Twice (2)
Who removes a lock or tag?
Person who applied it.
What inspection should be done in your area before work starts?
Site/Area Inspections
Working at ______ kills more workers each year than any other?
Heights
This is required if your work truck is parked anywhere on site
Parking Brake Applied
Part 46 are the MSHA rules governing what?
Surface Mines
A shock involving as little as _____ volts can be fatal.
40 Volts
A miner must receive this type of training based on scope of work performed?
Task Specific Training.
What should be done if a coworker is observed working unsafely?
Address it, stop it, or report it.
You are assigned a loader that has a fire extinguisher mounted, but the pressure gauge reads in the red. The extinguisher is still physically present.
MSHA requires you to do what?
Tag the equipment out of service until the extinguisher is serviced
A contractor is on-site for one day to repair equipment. What training must they have?
Site-specific hazard training
After a crushing plant is relocated, what electrical test is required before operation?
An OHMS-to-ground (ground resistance) test must be performed.
What is the first thing you do before working on a broken belt, crusher, or piece of equipment?
(LOTO) LOCK OUT TAG OUT (for everyone involved)
What does MSHA stand for?
Mine Safety and Health Administration (MSHA)