TECH
SiTE
WIRE
VOLTAGE
OSHA
100

Who must complete inspection prior to each shift

A competent person

100

The crane functions that cause two blocking are .?

Extending boom

booming down

hoisting

100

Lubricants must not hinder visual inspection

Rope

100

Up to .75 What is the distance 

4 ft clearence

100

Device which measures horizontal?

Boom angle indicator

200

At least every —- the equipment must be inspect by a ——???

 12 months.  Competent person

200

What’s it called when u drag or pull material wit crane ?

 Side loading 

200

What indicate core failure on wire?

Protrusion kinking distoration

200

Over 550 to 750

35 feet

200

Meaning the load travel or area near a load placement

Not in full view of operators 

300

What must be retained for a minimum of 3 months?

Document of inspection and who inspected it .

300

If deemed necessary what can u do to stop out of control load?

Use tagline 

300

What must be done if the correct number of wires are broken ?

 Must be tagged out  and deemed of service and 

300

If taglines are use they must be ?

Nonconductive polypropylene 

300

Hand signals must be either ——— on ———or conspicuously or in ——operations 

Posted 

Equipment

 vicinty of hoisting


400

Stablizer jacks must have  An integral holding device 

One way check valve 

400

To the operators perception of signals must be by?

Hands free device

400

Shift inspections criteria must be followed with records ?

maintained by employers minimum of 12 months 

400

Over 750 to 1.000

20feet

400

The total load with a personal platform must not exceed what percentage

50% of rated capacity

500

To use conditions is such that there is reasonable damage or excessive wear, the employers must stop using equipment 

 Severe service

500

Maximum allowable load a crane gives?

Rated capacity 

500

Inspections must include for maladjustment interfering with proper operation?

Control mechanisms 

500

Including rigging and lifting accessory’s closser to 20 feet of A.D PROCESS WHAT GUIDELINES SHOULD U FOLLOW?

Opt 1 deenergize and ground 

opt 2     20 foot clearence 

opt3 table a Clearence 

500

The system use to connect the personal platform to the equipment must allow the plat form to remain with in ——-regardless of boom angle 

10 degrees of level

M
e
n