We're in Trouble
Let's get planning
Redesigns
Who's Who in the Zoo
Final Jeopardy
200

A transformer is an example of this type of work

What is capital

200

CFCI Installations is an example of this

What is a project

200

Type of redesign when the CWO has not been QUAC'd when a redesign is required

What is a pre-quotation accept

200

Business Manager for Central Region FBCs

Who is Jennifer Bambridge

200

The Director of Work Line Management(AKA FBCs)

Who is Gianni Difilippo

400

A non-emergent trouble call 

What is an Assigned Trouble

400

A municipality will request a road authority for this reason

What is road work

400

A redesign is required when a change is needed after the design is in this status

What is DAPV

400

Planning CSS for Central Region FBC

Who is Breanne Hillier

600

The name of the device used to give a customer power when they have a bad underground

What is a service save/cab tire

600

This is what JUMP stands for

What is Joint Use Management Portal

600

Customer requested changes after they paid means this type of redesign

What is a pre-construct redesign

600

Customer Group CSS in Barrie

Who is Lori Moore

800

Refusing a switch is an example of this type of work

What is maintenance

800

End of Life pole replacement is an example of this

What is a maintenance program
800

This is the PMACType for a customer driven redesign

What is RDC

800

Customer Group CSS in Peterborough

Who is Tracy Tate

1000

Approval is required from the project manager for a post trouble in this case

What is when a design is required to make changes.

1000

Transformers after this year require testing for PCBs

What is 1981

1000

This is the where the WBS for a redesign can be located

What is the reporting register

1000

Manager of all FBCs

Who is Anthony Pellecchia

M
e
n
u