(Safety)
These 10 keys to success for Front-Line Supervisors can help them be safety leaders.
What is the FLS Top 10?
This person is the Underground District Quality Manager.
Who is Glen Tonack?
More commonly known by the acronym TSCD
What is Temporary Structures and Construction Devices?
The planning process we follow has this many steps
What is 6?
More commonly known by the acronym LPR
What is the Labor Productivity Report?
This manual houses all of the Underground specific safety policies.
What is the District Safety Reference Manual?
A plan which outlines the requirements for inspection and testing.
What is an Inspection and Test Plan (ITP)?
The person responsible for Initial Project TSCD Matrix sign off
Who is the Underground District Manager?
This schedule is reviewed at the start of each shift
What is the Plan of the Day (POD)?
Crew hours and quantities should be completed at this time.
When is the end of shift?
These two programs make up the proactive reporting structure for the district.
What are LSA Assessments and Observations?
More commonly known by the acronym ASTM
What is American Society for Testing and Materials?
The 3 risk levels for temporary designs
What are low, moderate, and high?
This is the first step of our planning process
What is Plan the Plan?
The project cost details report should be reviewed this often
What is Weekly?
Every operation must have these two documents in place, current, and signed before starting work.
What is a Build Plan and Start Card?
A point in an operation which must be verified by an independent authority or person before work can proceed.
What is a Hold Point?
This is required prior to a TSCD item's first use
What is an Initial Inspection and Documentation?
The staffing on a project is tracked on this schedule.
What is the Indirect Schedule?
Financial reporting is completed this often
What is Monthly?
These three programs make up "The Way We Do Safety" section of the Key Elements of Safety.
What are Craft Voice in Safety (CVIS), Life Saving Actions, and recognition programs?
This is meeting held with the Client to review the contractors Build Plan, Safety Plan, ITPs, Equipment, etc.
What is a pre-activity meeting?
According to the Underground Risk Matrix a pressurized utility system over 50 psi and under 200 psi is this risk category
What is Moderate?
A P6 schedule is made with this software
What is Primavera?
Production goals should be communicated this often
What is Daily?