Project stages
Project Stages
Abbreviations
Interconnection
Abbreviations
100

8a

Site Audit Completed

100

PTO

22

100

CRC

Contract Received Confirmed

100

What utility are we opening in Utah?

Rocky Mountain Power

100

ICO

Install Call Off

200

7a 

Contract Received Confirmed

200

21

Inspection Complete

200

TDR

Temporary disconnect / reconnect

200

Name 2 of the smaller co-ops in TX

Pedernales, CoServ, Bluebonnet Electric, Guadalupe Valley Electric, Tri-County Electric, United Electric Coop, El Paso Electric

200

COP

Change order pending 

300

13

Engineering Design Complete

300

Install complete

19

300

HO

Homeowner

300

When is a load calc used for? 

To justify a system size when the customer has less than 12 months of usage history. Or to justify a larger system size if the customer has usage history but will be adding additional loads like an EV, pool, hot tub, etc. 

300

CP

Channel Partner

400

14

Permit Sent

400

18

Installation

400

SR

Sales rep

400

How can you tell the difference between a load side v line side tap? Where can you find this info? 

Line Side: point of interconnection is ABOVE main breaker. Disconnect is fused. 


Load side: Point of interconnection is below the main breaker. Disconnect is non-fused. 


Found on line diagram 

400

BP

Build Partner

500

16

Permit received

500

Install Ready

17

500

VSS

Virtual Site Survey

500

You receive meterspot results and need to relocate the meter. The project's design has not yet been completed. What should you do if you need to notify the Engineering Team or something that needs to be included in the plans pre stage 13?

Add notes in the site approval job & flip flow status to Change Order Complete

500

RMA

Renewable meter adaptor

M
e
n
u