100

 BP, MB, & TH stand for

Backplane, Motherboard, Testhead

100

the tool _____ is used to test xIUs in PCM, that we have ______ (#) of

PMM, 5

100

RO stands for: ________ and it means _________

Repeat offender - the xIU came down for the same fail multiple times within 1000 TDs

100

You go here to see the list of xIUs that are Incoming/Outgoing

 (shipping table at the bottom of) Fuzion

100

Number of days you have to complete your LV1 PCM certifications (according to upper management) after you start on your shift

30

200

The 'tag' that's used to assign an xIU name to a card, that the PMM reads to identify it

RFID tag

200

3 workstations PCM MTs can use that are currently on the floor *****Bonus: if you can list 5*********

LCAS, PRIus, OPRS (+ soldering & lapping)

200

the Bin that is considered the 'equivalent' to EZA NAPT

Bin 15

200

NFV and RFV stand for: 

New From Vendor, Returned from Vendor

200

________ is the first certification you should focus on getting after you completed your PCM LV1 certs (unless specifically told otherwise by your manager)

PRIus & PCM LV2

300

The technologies that need fiducial alignments when putting TH onto the MB are ________

MF technologies (FFI)

300

the 3 station names at the PMM

Station Controller, Tool Controller, Vision Controller 

300

The order of SPECs/SCIs you follow to find RFCs pertaining to H68?
***Bonus*** what do you do if you can't find your answer in those Specs

DoW36 SCI --> DoW36 main --> TP SCIs --> TP main

***Browse through the General PCM Die Sort Specs, or Advanced Specs... lastly you escalate to SR. Tech on shift or ENG****

300

Where you can find the shipping doc that you should definitely reference (besides SPEC) when performing shipping procedures, and what its known name/title

Fuzion ('Shipping BKMs')

300

request training on _______ during your shift in order to be ready for your PCM LV2 certification (in other words, _____ was not covered in Cert Lite but is part of PCM LV2 cert)?

DMM - Digital Multi Meter testing of capacitors and resistors (for when you have CAPLEAK fails)

400

the _________ procedure must be performed before you can do a MF (FFI) TH swap

"Probe floating" 

400

the PCM tool(s) that are used to check NFs and XY fails

PRIus/OPRS

400

Per DoW36 Spec ELEC failure RFC, you can waive a 'new' or inconsistent ELEC OL unless you have done what during your RFCs?

TH removal (typical performed for split clean procedure/VI of cpst & DE)

400

5 things you do if you are performing Incoming/Outgoing procedures, and during your VI you notice something doesn't match up with Pulsar/wasn't previously documented in card history

Stop the job, comment in MES, update Pulsar to match what you see, log the card to EngHold, and NOTIFY/EMAIL THE PO

400

use this to convert the SWAT*** fail codes into POIs/failing channels (name two options)

Pulsar or TTB files (+ 'PinDef' files)

500

The BP connects to what when running in a cell?

to the HDMT connectors 

500

the weekly for PMM(s)______ is YOUR shift responsibility

SH4: SH5: SH6: SH7:

500

Bin 8 RO card is now passing, so it gets logged: ________

ENGHold

500

The document (its known name) that you HAVE TO review while performing Incoming from vendor that gives you a risk assessment of the product

CAN docs

500

you log a card to WaitingMetrology for "___________" when a card is __________ (what type?) of Incoming

"preconditioning" and "New from Vendor"