100

1 x 6 Flat Bar $7,050

Various Square Tube $1,200

Wherever you used it! Any logical answer except 00.708 "Repair Other" Wins!

100

New Soft Start/Benshaw for Primary Crusher

00.701

Please utilize 00.727 for generic electrical like ground test, lighting

100

Manlift for all year

Doesn't matter - Call James & Erin

(CT 28)

100

Hauling Shot Rock to the Primary

00.232 Hauling

No more 00.230 Material Transfer PLEASE!

100

Mag Drill & Slugger Bits $2,000

Please don't say repair other

200
Crane Rentals $3,400

Hardox $3,323

TODD!?

200

Mowing for scalehouse/property entrance

00.830.01 Site/Rd Maintenance Entrance is Preferred

000.830 acceptable, but tends to be a catch all just like repair other

200

Gloves, Hi-Viz, Hardhats

CT 40 Supplies

Phase safety/health supplies 00.880

200

Loading Shot Rock In The Pit

Pit Loading 00.231

200

Assorted Tool Order From Motion

PLEASE ANYWHERE BUT REPAIR OTHER

Where are the bulk of the tools used? Crusher Repairs? Conveyor Repairs? Facebook Marketplace? 

300

"All Visitors Must Stop To Check In At The Scalehouse" Signage $360

00.030, 40

00.830, 40 Site/Road Maintenance

00.880, 40 Safety/Health Supplies

300

Standard screens for any screen deck

00.705.01 Screening Media

300

Secondary Breakage 

25 Subcontracts

(Phase 00.240 Secondary Breakage)

28 Equip Rent/Lease Short Term is used for equipment only, not equipment & an operator

300

Changing screens in the morning, then plant utility remainder of the day

00.705.1 

00.502?00.503? Tertiary or Secondary Crushing? Some 500's phase code. Stay consistent for the plant. NO 00.508 OTHER PROCESSING

Will accept 00.705 as an answer, most important thing is the time gets separated.

300

Who is to blame for approving coding to repair other? 

John & Andy - Lazy!!!

(Don't get mad at us this year when we reject things and ask for different coding)

Some larger locations have approvers before us - please double check before approving Repair Other.

400

Liquid Heat $506

Digital Multimeter $141

00.506, 40 Conveying Supplies

00.706, 30 Conveying Parts

00.727, 30 - or Whatever you're using it for! Conveyors mostly? 00.706 Screen motors? 00.705

400

Propane/Natural Gas/Heating Oil for the crusher shop

00.660 Energy-Purchased CT 64 Utilities - Bldg Oil

400

Radiator clean/pressure test/repair dropped off at a shop

32 Outside Repairs

400

Processing Rap

00.500.1 Processing-Rap FOR EVERYONE

400

Plumber Called For The Scalehouse Toilet $1,100

(Big Mess)

00.030, 25 Scalehouse/Subcontracts

00.720, 32 Repair Scales/ Outside Repairs

500

Ear Plugs, Hammer Drill, & Drill Chisel Bits For Frozen Winter R&M Work

Please charge it all to 00.706, 30 (00.705 for screen work, 00.701 for primary crusher) 

EXCEPT the ear plugs get charged to 00.880, 40 Safety & Health Supplies

500

Primary Crusher Manganese Liners

Tertiary Crusher Manganese Liners

00.701.1 Repair Primary Manganese

00.703.1 Repair Tertiary Manganese

500

Natural Gas OR Building Heating Oil/Propane

CT 63 Bldg. Electricity

CT 64 Bldg. Oil

500
Moving Agg from the crusher to stockpile

Moving Agg from stockpile to Asphalt Plant

Crusher, 00.509 Stockpile

Crusher, 00.509.01 Stockpile to HMA

500

12" Pipe For New Dewatering Pump $4,500

00.707, 30 Wash Plant/RM Parts

00.250, 40 Pumping Supplies